Laserfiche WebLink
Page 1 of 2 <br />SCRAPER TEAM WORK <br />Task description: Regrade and Cover Refuse Disposal Area RP -1 <br />Site: Deserado Mine Permit Action: Permit Renewal 06 Permit/Job #: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 026 State: Colorado <br />Date: 7/16/2014 County: Rio Blanco <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: Cat 637G <br />- Dozer: NA <br />Abbreviation: None <br />Filename: 026 <br />COSTShift basis: 1 per day <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Scraner Work Team Sunnort Fouinment Maintenance F.auinment <br />Total work team cost/hour: $2.325.54 <br />MATERIAL OUANTITIES <br />Initial volume: 13,632 CCY Swell factor: 1.111 <br />Loose volume: 15,145 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Permit Volume IV Operator Study <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$110.90 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$243.12 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$33.56 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$387.59 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />6 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$2,325.54 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $2.325.54 <br />MATERIAL OUANTITIES <br />Initial volume: 13,632 CCY Swell factor: 1.111 <br />Loose volume: 15,145 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Permit Volume IV Operator Study <br />HOURLY PRODUCTION <br />CIRCES Cost Estimating Software <br />Scraper Bowl (volume) Basis: <br />Material weight: <br />2,743 lbs/LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />User Provided <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />81,600 pounds <br />Average Volume: <br />29.00 <br />LCY <br />Payload Capacity: <br />29.75 LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />