My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-08-12_PERMIT FILE - C1981018A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018
>
2015-08-12_PERMIT FILE - C1981018A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2019 12:56:52 PM
Creation date
8/13/2015 1:08:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
8/12/2015
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Illustration 47
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont'd Task # 000 Page 2 of 3 <br />055 <br />060 <br />061 <br />062 <br />063 <br />064 <br />065 <br />066 <br />067 <br />070 <br />071 <br />072 <br />073 <br />074 <br />075 <br />076 <br />077 <br />080 <br />081 <br />082 <br />083 <br />084 <br />085 <br />086 <br />087 <br />088 <br />089 <br />090 <br />094 <br />096 <br />097 <br />100 <br />102 <br />104 <br />105 <br />106 <br />107 <br />108 <br />114 <br />Grade Topsoil/Subsoil Storage Area <br />GRADER <br />1 <br />4 <br />4 <br />4 <br />4 <br />4 <br />1 <br />4 <br />4 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />I <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />3 <br />4 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />11.53 <br />$1,573.00 <br />$799.00 <br />$2,057.00 <br />$2,180.00 <br />$1,475.00 <br />$48.00 <br />$1,783.00 <br />$2,106.00 <br />$206.00 <br />$68,139.00 <br />$51,509.00 <br />$140,723.00 <br />$32,055.00 <br />$160,745.00 <br />$3,650.00 <br />$1,046.00 <br />$17,320.00 <br />$3,144.00 <br />$3,544.00 <br />$3,544.00 <br />$2,851.00 <br />$24,033.00 <br />$205.00 <br />$554.00 <br />$1,434.00 <br />$175.00 <br />$146.00 <br />$46.00 <br />$40,257.92 <br />$130,135.00 <br />$1,850,651.05 <br />$98,380.00 <br />$30,825.00 <br />$25,569.00 <br />$33,472.00 <br />$33,343.00 <br />$56,762.00 <br />$13,328.00 <br />$26,381.00 <br />Re grade Pond RP -1 Area <br />DOZER <br />0.76 <br />Re grade Pond RP -2/3 Area <br />DOZER <br />1.96 <br />Re grade Pond RP -4 Area <br />DOZER <br />2.08 <br />Re grade Pond RP -5a Area <br />DOZER <br />1.41 <br />Re grade TS #2 Sediment Pond <br />DOZER <br />0.05 <br />Remove Scullion Gulch Check Dams <br />TRUCKI <br />3.75 <br />Re grade B -Seam Dewatering System Pond Area <br />DOZER <br />2.01 <br />Re grade Two Dewatering Ponds Expansion <br />DOZER <br />0.20 <br />Replace Topsoil from Stockpile to D -Portal Area <br />SCRAPERI <br />29.30 <br />Replace Topsoil from Stockpile to East and West <br />Haulroads <br />SCRAPERI <br />22.15 <br />Replace Topsoil from Stockpile to RP -2/3/4 <br />SCRAPERI <br />60.51 <br />Replace Topsoil from Stockpile to RP -1 <br />SCRAPERI <br />13.78 <br />Replace Topsoil from Stockpile to RP -5a <br />SCRAPERI <br />69.12 <br />Replace Topsoil from Stockpile to Slot Storage <br />Area <br />SCRAPERI <br />1.57 <br />Replace Topsoil from Stockpile to Alluvial Well <br />Area <br />SCRAPERI <br />0.45 <br />Replace Topsoil from Stockpile to Overland <br />Conveyor Corridor <br />SCRAPERI <br />7.45 <br />Load/Place Topsoil from D -Portal to East Portal <br />Vent Shaft <br />TRUCKI <br />3.98 <br />Replace Topsoil to Pads/Roads MRs /TRs after <br />RN5 <br />DOZER <br />3.38 <br />Replace Topsoil from Stockpile to Access Roads <br />DOZER <br />3.38 <br />Replace Topsoil from Stockpile to Pond RP -5a <br />DOZER <br />2.72 <br />Replace Topsoil from Stockpile to Drill Pads, <br />Ponds, Ditches <br />DOZER <br />22.91 <br />Replace Topsoil from Stockpile to Rock Dust <br />Facility <br />DOZER <br />0.20 <br />Replace Topsoil from Stockpile to Pond, Road, and <br />La down <br />DOZER <br />0.53 <br />Replace Topsoil from Stockpile to B -Seam Vent <br />Shaft and Road <br />SCRAPERI <br />0.62 <br />Replace Topsoil from Stockpile to Light Use Road <br />to RDH -3 <br />DOZER <br />0.17 <br />Replace Topsoil from Stockpile to B -Seam <br />Dewatering Area <br />DOZER <br />0.14 <br />Replace Topsoil from Stockpile to Dewatering <br />Ponds Expansion <br />DOZER <br />0.17 <br />Seal Portals and Vent Shafts <br />MINESEAL <br />160.00 <br />Plug and Seal All Boreholes <br />BOREHOLE <br />512.00 <br />Demolish and Remove All Structures <br />DEMOLISH <br />960.00 <br />Drill Seeding - Large Permanent Areas <br />REVEGE <br />342.08 <br />Broadcast Seeding - Large Permanent Areas <br />REVEGE <br />34.00 <br />Drill Seeding - Small/Linear Areas <br />REVEGE <br />97.24 <br />Broadcast Seeding - Small/Linear Areas <br />REVEGE <br />39.04 <br />Drill Seeding - Interim and Drill Sites <br />REVEGE <br />129.12 <br />Broadcast Seeding - Interim and Drill Sites <br />REVEGE <br />66.94 <br />Weed Control for Reseeded Areas (Assume 20% <br />of Area X 3 <br />REVEGE <br />425.00 <br />Clean Sediment Ponds RP -1, 2/3, 4 and 5a one <br />time <br />TRUCKI <br />61.16 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.