Laserfiche WebLink
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Replace Topsoil from Stockpile to Light Use Road to RDH -3 <br />Site: Deserado Mine Permit Action: Permit Renewal 06 Permit/Job #: C1981018 <br />PROJECT IDENTIFICATIOTS <br />Task #: 088 <br />Date: 7/16/2014 <br />User: JRS <br />State: Colorado <br />County: Rio Blanco <br />Agency or organization name: DRMS <br />HOURLY EOU <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />IPMENT COST <br />Cat 139T - 9SU <br />405 <br />Semi - Universal <br />3 -shank ripper <br />1 per day <br />(CRG) <br />Abbreviation: None <br />Filename: 088 <br />Total unit Cost/Hour: $262.26 <br />Total Fleet Cost/Hour: $1,049.04 <br />MATERIAL OUANTITIES <br />Initial Volume: 550 <br />Swell factor: 1.111 <br />Loose volume: 611 LCY <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />C -1981 -018, Permit Volume IV <br />Operator Study <br />75 feet <br />1,514.3 LCY /hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />0% <br />5,300 feet <br />2,550 Ibs/LCY <br />User <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$81.10 <br />NA <br />Operating Cost/Hour: <br />$143.16 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $262.26 <br />Total Fleet Cost/Hour: $1,049.04 <br />MATERIAL OUANTITIES <br />Initial Volume: 550 <br />Swell factor: 1.111 <br />Loose volume: 611 LCY <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />C -1981 -018, Permit Volume IV <br />Operator Study <br />75 feet <br />1,514.3 LCY /hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />0% <br />5,300 feet <br />2,550 Ibs/LCY <br />User <br />CIRCES Cost Estimating Software <br />