Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 083 Page 2 of 2 <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Source <br />0.900 <br />(AB.AVG. <br />1.000 <br />(CAT HB <br />1.000 <br />GEN. <br />1.000 <br />AVG. <br />0.830 <br />(1 SHIFT/DAY) <br />0.900 <br />(SSD -FC) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.902 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.6064 <br />Adjusted unit production: 424.48 LCY /hr <br />Adjusted fleet production: 1697.92 LCY /hr <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.618/LCY <br />Total job time: <br />Total job cost: <br />2.72 Hours <br />$2,851 <br />CIRCES Cost Estimating Software <br />