Laserfiche WebLink
EARTH ENGINEERING CONSULTANTS, LLC <br />SUMMARY OF FIELD DENSITY TESTS -�� <br />)roject Name: Turnpike Sand & Gravel Pit - Backfill Zone Project No 1134011 <br />Location: Erie, Colorado Date January 2015 <br />Proctor Designation <br />A <br />Maximum Dry Density (pcf) <br />112.0 <br />Optimum Moisture Content (%) <br />15.5% <br />Required Moisture Variance <br />7% to 18% <br />Required Percent Compaction <br />90% <br />Laboratory Method <br />ASTM D-698 <br />Z� <br />o <br />m <br />E <br />m <br />o Z <br />Approximate Test Location / Notes <br />Elev. / Lift <br />No. <br />Field Test Results° <br />Material Percent <br />(Proctor) Moi <br />Dry <br />Density <br />3 <br />2 <br />� <br />n <br />a <br />U <br />Project Specs ' <br />Moisture .Comp. <br />(Pass / (Pass / <br />Fail) Fail) <br />8 <br />9 <br />1/16 <br />1/16 <br />1 <br />2 <br />Fill - See Diagram <br />Fill -See Diagram <br />2.0 <br />2.0 <br />A <br />A <br />11.7% <br />12.2 % <br />6% <br />Pass <br />Pass <br />Pass <br />Pass <br />10 <br />11 <br />1/16 <br />1/16 <br />3 <br />4 <br />Fill -See Diagram <br />Fill - See D agram <br />2.0 <br />2.0 <br />A <br />A <br />11.8% <br />11.9% <br />6% <br />04% <br />Pass <br />Pass <br />Pass <br />Pass <br />12 <br />1/16 <br />5 <br />Fill - See Diagram <br />2.0 <br />A <br />12.3% <br />041049,t64% <br />02% <br />Pass <br />Pass <br />r <br />MEW <br />D <br />X09 <br />