Laserfiche WebLink
EARTH ENGINEERING CONSULTANTS, LLC <br />SUMMARY OF FIELD DENSITY TESTS <br />Project Name: Turnpike Reservoir Project No: 1134011 <br />Location: Erie, Colorado <br />Proctor Designation <br />A <br />Maximum Dry Density (pcf) <br />112.0 <br />Optimum Moisture Content (%) <br />15.5 <br />Required Moisture Variance <br />7% to 18% <br />Required Percent Compaction <br />90% <br />Laboratory Method <br />ASTM D-698 <br />Date: January 2015 <br />E <br />,N, Z <br />a <br />E <br />Z <br />Approximate Test Location Notes <br />Elev. / Lit <br />No. <br />Field Test Results <br />Material Percent <br />(Proctor) Moisture <br />D <br />Density <br />c W <br />U <br />Compliance with <br />Project Specs <br />Moisture <br />%Comp.co <br />(Pass/ (Passo / <br />Fail) Fail) <br />1 <br />12/17 <br />1 <br />Fill - See Diagram <br />8.0 <br />A <br />2.8 <br />114.9 <br />-2.7% <br />103% <br />Pass Pass <br />2 <br />12/17 <br />2 <br />Fill - See Diagram <br />8.0 <br />A <br />11.6% <br />112.5 <br />-3.9% <br />100% <br />Pass Pass <br />3 <br />12/17 <br />3 <br />Fill - See Diagram <br />8.0 <br />A <br />11.1% <br />112.7 <br />-4.4% <br />101% <br />Pass Pass <br />4 <br />12/17 <br />4 <br />Fill - See Diagram <br />8.0 <br />A <br />10.8% <br />111.4 <br />-4.7% <br />99% <br />Pass Pass <br />5 <br />12/17 <br />5 <br />Fill - See Diagram <br />4.0 <br />A <br />12.9% <br />115.0 <br />-2.6% <br />103% <br />Pass Pass <br />6 <br />12/17 <br />6 <br />Fill - See Diagram <br />4.0 <br />A <br />13.7% <br />112.4 <br />-1.8% <br />100% <br />Pass Pass <br />7 <br />12/17 <br />7 <br />Fill - See Diagram <br />4.0 <br />A <br />12.4% <br />111.9 <br />-3.1 % <br />100 <br />Pass Pass <br />t <br />� <br />t <br />6 <br />