Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) <br />SQUAW GULCH (VLF) WEEKLY REPORT <br />CQA ACTIVITIES: <br />1) Field Activities: <br />A. <br />amec <br />foster <br />wheeler <br />The following activities were observed: Placement and compaction of the Phase 1 & 2 Structural Fill <br />materials; placement, compaction, density testing and depth verification of Soil Liner Fill materials; pump <br />monitoring at the LVSCS riser pipes; subgrade acceptance; soil liner fill acceptance; geomembrane <br />installation and acceptance; and remediation of underground workings. <br />II) Laboratory Activities: <br />Concrete testing, atterberg limits, moisture, compaction, permeability and sieve analysis testing <br />continued. <br />The following samples were collected: <br />General Project Items <br />Meetings and Discussions: <br />Phase 1 — Soil Liner Fill; 1-SLF-18-R <br />Cameron — Soil Liner Fill; SLF-188-C <br />The Weekly Contractor Meeting was held July 21, 2015 (Amec Foster Wheeler, CC&V, Ames). Amec <br />Foster Wheeler and CC&V discussed the barren pipeline corridor immediately following the Weekly <br />Contractor Meeting. <br />Ames daily safety meetings <br />Amec Foster Wheeler daily safety meetings <br />Summary of Concerns: None. <br />CC&V: Daily updates, reporting, and scheduling occurred between CC&V Projects, Amec Foster <br />Wheeler, and Ames. <br />Deliveries: None. <br />CQA Monitor '��, i <br />Submitted by: r1/�J Date: July 29, 2015 <br />Bobby Redd, EI <br />Project Resident <br />Reviewed by: <br />CC&V Projects <br />Reviewed By: — -- <br />Date: <br />Date: FA Azr-5 <br />Reviewed By: Date: <br />