Laserfiche WebLink
Table L-2: Building Inventory and Cost Summary of Building Removal <br />Structure Construction Foundation Permanent <br />Post Mine Reclamation <br />Use Cost <br />1 Office/Dry Building 2 story 6" concrete slab/w rebar <br />Yes, but remove certain <br />Storage 2400 <br />inside items <br />2 Filter Building 2 story 6" concrete walls 12" concrete slab/ w rebar <br />Yes, but remove inside <br />Storage 4000 <br />equipment <br />3 <br />500 gal Water Tanks <br />Plastic 500 gallon tanks None No None 600 <br />4 Snow Shed/Battery 45' x 120' with track with <br />6" slab concrete <br />Yes but remove inside <br />Storage 1400 <br />Charger Bldg metal siding equipment <br />5 Crusher Retaining 28 ft long x 16 ft high <br />Wood beams and steel <br />No None 4000 <br />Wall beams <br />6 <br />Septic Tank/Septic <br />Yes None 0 <br />Field <br />7 <br />Access Road <br />100 ft long gabions None Yes Site Access 0 <br />Retaining Wall <br />8 <br />Miscellaneous Surface <br />Various materials on site None No None 3500 <br />Cleanup <br />9 8000 gal diesel tank Steel tank on skids None No None 500 <br />10 Propane Tanks None No None 300 <br />11 <br />Mine Equipment <br />145' x 50' Quonset Hut <br />6" foundation to be <br />Building No, Slab Yes None 2000 <br />Storage/Shop covered/reclaimed <br />Revenue Mine June 2015 L-4