Laserfiche WebLink
All chemicals used in the mill will be removed and properly disposed of off-site. <br />Table L-2 shows a breakdown of what structures are being removed and what are remaining <br />3. Topsoil Replacement Area <br />Atlas area 4.53 acres <br />Revenue Pile area 10.21 acres <br />Mine water pond remaining behind 0.35 acres <br />Northeast rangeland area 0.97 acres <br />Southeast rangeland area 1.06 acres <br />Total area to be topsoiled 16.42 acres <br />Table L-1 shows the bond estimate for topsoiling the areas listed above. <br />Revenue Mine June 2015 L-2