Laserfiche WebLink
TH-11 2 19 10 119 33 18 91 <br />TH-11 2 29 9.3 107 35 20 94 <br />TH-14 2 49 12.4 ND 38 24 64 <br />TH-16 2 29 9.6 130 40 28 98 <br />TH-19 2 31-34 20.3 ND 36 21 58.9 <br />b) Post Mining Land Use Comparison <br />The site is currently used as a developed water resource facility and is consistent <br />with the Town of Lafayette's master plan. Other land uses surrounding the site <br />include rural residential and agricultural and Boulder County Conservation <br />easements. The Goose Haven reservoir site is compatible with those land uses. <br />c) Description of How the Reclamation Plan will Meet the Requirements of <br />Section 3.1 <br />Completion of the reclamation plan described herein shall meet the requirements <br />of Section 3.1 <br />d) Topsoil Segregation <br />Topsoil shall be segregated as shown in Exhibit C-2. <br />e) Reclamation Sequence and Timetable <br />An estimate of the sequence and periods of time for each reclamation activity is <br />given in Table 6.4.5-1. <br />Table 6.4.5-1. Reclamation Sequence Summary <br />Mining Cell / Size Reclamation Activity Approximate Time Period <br />Cell 2 / 35 acres Construct Compacted Clay Following Mining of Cell 2 <br />Liner and Construct <br />Appurtenant Pipeworks <br />Cell 2 / 35 acres Perform Topsoiling / Following Construction of <br />Revegetation Compacted Clay Liner <br />Cell 4 / 26 acres Construct Compacted Clay Following Mining of Cell 4 <br />Liner and Construct <br />Appurtenant Pipeworks <br />Cell 4 / 26 acres Perform Topsoiling / Following Construction of <br />Revegetation Compacted Clay Liner