My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-22_PERMIT FILE - C1981018A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018A
>
2015-06-22_PERMIT FILE - C1981018A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:08:36 PM
Creation date
8/12/2015 7:50:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
6/22/2015
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Illustration 47
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont'd Task # 000 Page 3 of 3 <br />115 <br />Site Maintenance During Reclamation and Ten- <br />SITEMAINT <br />1 <br />400.00 <br />$130,274.00 <br />2,080.00 hrs <br />Year Liability <br />ENANCE <br />10.00% <br />Total = <br />$445,747.70 <br />120 <br />Mobilize/Demobilize Equipment for Initial <br />MOBILIZE <br />1 <br />10.00 <br />$38,901.00 <br />Reclamation <br />121 <br />1 <br />$6,302.00 <br />Mobilize/Demobilize Equipment for Initial <br />MOBILIZE <br />10.00 <br />Reclamation <br />122 <br />1 <br />$4,698.00 <br />Mobilize/Demobilize Equipment for Pond <br />MOBILIZE <br />10.00 <br />Cleaninin Maintenanc <br />SUBTOTALS: <br />4709.64 <br />$4,457,477 <br />INDIRECT COSTS <br />14351131 -1 Wi0jrliff -11ti—ttlym <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />2.02% <br />Total = <br />$90,041.04 <br />1.05% <br />Total = <br />$46,803.51 <br />2,080.00 hrs <br />Total = <br />$156,332.80 <br />10.00% <br />Total = <br />$445,747.70 <br />TOTAL O & P = <br />$738,925.05 <br />CONTRACT AMOUNT (direct + O & P) = <br />$5,196,402.05 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and /or administration: <br />0.00 <br />4.61% <br />3.58% <br />Total = 0.00 <br />Total = $239,554.13 <br />$186,031.19 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $1,164,510.38 <br />TOTAL BOND AMOUNT (direct + indirect) = $5,621,987.38 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.