My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-22_PERMIT FILE - C1981018A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018A
>
2015-06-22_PERMIT FILE - C1981018A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:08:36 PM
Creation date
8/12/2015 7:47:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
6/22/2015
Section_Exhibit Name
Section V. Mine Surface Facilities Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
was removed. Only soils from areas that were disturbed for facilities were utilized for reclamation. <br />The remainder of the material was separately removed, stockpiled and replaced as subsoil or cover <br />material (see Section 11.1.7.b Topsoil Handling). Appendix V-1 tabulates haul road topsoil volume and <br />mapping area for the existing stockpiles #1 to #11 and future stockpiles #12 to #14. <br />On drill and other small sites topsoil along with existing vegetation is stripped with dozers and left in a <br />small pile or berm in a protected corner or side of the site. The soil is left loose to prevent compaction <br />and reseeded as warranted based on the projected life of the facility. <br />The stripping of material to be used as cover for special non -coal wastes (Section 4.09) or coal waste <br />banks (Section 4.10) in the waste disposal area was done after the topsoil was stripped. Material <br />which was to be stored was treated in the same manner as a permanent topsoil stockpile. Since the <br />thickness of available cover material varied, the stripping depths were varied in order to obtain <br />enough material to provide the required cover. <br />TABLE V-3 <br />SUMMARY OF DISTURBED AREAS <br />DESCRIPTION AREA (ACRES) <br />REFERENCE <br />"D" Portal Area <br />39.09 <br />Maps 23-28 <br />Water Tank Area & access Road <br />8.17 <br />Maps 52-54 <br />Haul Road & Plant Access Road <br />17.64 <br />Maps 70 & 71 <br />Haul Road (County Road to Refuse Area) <br />41.95* <br />Maps 71-75 <br />Refuse Area <br />513.00* <br />Map 76 <br />East Portal/Ventilation Entry Area & road <br />2.86 <br />Maps 85 & 88 <br />B -Vent Shaft (#1) facility & access <br />1.37 <br />Map 151 <br />B -Vent Shaft #2, SH -1, SH -2, & road <br />2.80 <br />Map 155 <br />north of RDH -3 <br />B -Seam Dewatering System/SH-3 <br />5.55 <br />Map 157 <br />B -Vent Shaft #3 <br />0.88 <br />Map 156 <br />Alluvial Well Area & Access Road <br />1.80 <br />Maps 90 & 91 <br />Overland Conveyor Access -Maintenance Rd.** <br />36.23 <br />Maps 106-113 <br />Slot Storage Facility <br />7.54 <br />Map 105 <br />Halandras Trash Dump <br />12.40 <br />Map 136 <br />Return shafts <br />8.59 <br />Map 147,152,153 <br />Degas, development drilling, nitrogen injection <br />Map147, 154,155,158, <br />Holes, rock dust facilities, SH -4 <br />134.77 <br />159 <br />Staging/laydown areas <br />32.82 <br />Map 147 <br />TOTAL <br />867.46 <br />Notes: <br />* Total for mine life. <br />** The loadout tower and associated disturbances are included with the overland <br />conveyor. The tower is the terminus for the conveyor system. <br />Minor Revision #164 (05/2015) V-24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.