Laserfiche WebLink
Figure E-2 Office/Shop Building On Site <br />The closer portion of the building (metal siding) will remain for use as the tack building. The taller foam <br />portion will be removed. <br />2.0 Gold Mine Area Reclamation <br />The mining plan describes that approximately 47 cuts will be made to bedrock as shown On Map C-2. <br />For this plan, the operation will be active in three cuts at the same time: the previous cut will be in the <br />process of being backfilled and topsoiled, the existing cut will have gold extraction and the cut ahead of <br />the active pit will have topsoil and overburden removal. In this way, the disturbance will always be <br />minimized to these three cuts. The processing plant and surrounding area will also be active during the <br />mining operation. The final cut, Cut #47 will be smoothed to a slope of 4H:1 V or less and will be left as <br />a lake for the post -mining land use. South Ponds #1, #3 and #4 will be combined into one large pond to <br />serve the future development as a sediment catch basin at the low point of the entire permit area. Pond <br />#2 will be filled in with overburden and topsoiled. <br />Alma Place Mine 01/15 43 <br />