Laserfiche WebLink
will be reclaimed if the operation is fully mined according to the plan described in this amended permit. <br />This is shown on Map C-1 — Pre -Mine Map. The map shows that the total pre -law disturbed areas total <br />97.4 acres. The total minimum area of reclamation commitment in all cases is 48.0 acres. The total <br />reclaimed area if the mining plan is fully carried out is 138.1 acres. This case allows for the reclamation <br />of all pre -law highwalls, pre -law gravel piles and other pre -law disturbances. The work to reclaim the <br />pre -law disturbances would occur gradually as mining continues, allowing the allocation of a portion of <br />the proceeds to be used for the reclamation. <br />The mill building to be constructed in 2012 will remain after reclamation as a horse barn for the <br />residences that are planned in the post -mine land use. The building will be 170 feet x 80 feet long and <br />will have stamped steel panel walls and a steel roof. It is ideal for this use and will improve the value of <br />the residential land use when the site is reclaimed. Figure E-1 on the following page shows these items <br />in more detail. <br />The west portion of the office/shop/warehouse will be dismantled and removed but the eastern portion <br />will remain as hay storage and tack area for the horse barn. Figure E-2 on the following page shows these <br />items in more detail. <br />Alma Place Mine 01/15 41 <br />