Laserfiche WebLink
The annual average tonnage mined and sold from the site are best predictions since many factors such <br />as the economy, competition, etc. greatly affect the actual sales. <br />The life of the gravel operation will be approximately 15 years. Where the gravel is mined from is not <br />easy to determine since it is very dependent upon the gold operation. If the gold operation is viable over <br />the 12-13 years shown in the plan, a large part (60,000 tpy) of the gravel sold from the site will be the <br />waste gravel from the gold plant. If the gold operation is uneconomic, gravel will then be aggressively <br />mined from the gravel mine area as shown on Map C-2. For planning purposes, it is predicted that the <br />gravel operation will be in place 15 years at an average product sales rate of 130,000 tons per year, with <br />2 possible scenarios: <br />Scenario 1 <br />Year <br />Gravel from piles <br />t <br />Gravel from gold <br />roc. t <br />Gravel from <br />excavation t <br />Total Gravel (tpy) <br />1 <br />70,000 <br />60,000 <br />0 <br />130,000 <br />2 <br />70,000 <br />60,000 <br />0 <br />130,000 <br />3 <br />70,000 <br />60,000 <br />0 <br />130,000 <br />4 <br />1 70,000 <br />60,000 <br />0 <br />130,000 <br />5 <br />70,000 <br />60,000 <br />0 <br />130,000 <br />6 <br />70,000 <br />60,000 <br />0 <br />130,000 <br />7 <br />70,000 <br />60,000 <br />0 <br />130,000 <br />8 <br />70,000 <br />60,000 <br />0 <br />130,000 <br />9 <br />70,000 <br />60,000 <br />0 <br />130,000 <br />10 <br />70,000 <br />60,000 <br />0 <br />130,000 <br />11 <br />70,000 <br />60,000 <br />0 <br />130,000 <br />12 <br />70,000 <br />60,000 <br />0 <br />130,000 <br />13 <br />0 <br />0 <br />130,000 <br />130,000 <br />14 <br />0 <br />0 <br />130,000 <br />130,000 <br />15 <br />0 <br />0 <br />130,000 <br />130,000 <br />Total <br />1,230,000 <br />Scenario 2: The gold mine does not operate for any significant period of time. In this case, the gravel <br />mine will produce all sold material from the gravel mine area, which is basically 2,000,000 tons over the <br />15 year period. Almost all of the previously mined areas are reclaimed from gravel mining. <br />In either scenario, front end loaders will be used to deliver the raw gravel to the crushing, screening and <br />wash plants for separation into various products. Fogger sprays will be present in all three plants to keep <br />dust down. The crusher will also employ sprays. The plants will be located to minimize impacts to the <br />town of Alma. <br />Alma Place Mine 01/15 29 <br />