6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Much of the 4 drill sites (0.2 acres) are pre -disturbed and had rock outcrops with little soil. <br />The soil for reclamation will be obtained from the area around the pads, some of which <br />was part rock and part soil. I he estimated replacement opsoidepth is 3 inches. <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />No drill holes remain to be plugged. No new holes will be drilled for this NOI. <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />None. <br />11. Describe how roads will be reclaimed or returned to their pre -prospecting (or better) condition: <br />All ra- 2 -d -M are Pre-o4stong roads and 4A1011 be left in the sarne condition as they were prior to <br />this replacement NOI. No new work on roads is contemplated and no roads will be <br />extended or created as part of this NOI. The grading work on one road cut is incorporated <br />into the 850 cy of grading work already iscusse . <br />