Laserfiche WebLink
0 <br />I <br />U, <br />t� SCHLOSSER, INC. <br />EXHIBIT C MINE PLAN MAP <br />755 HWY 385 <br />BURLINGTON, CO 80807 =��® <br />= SCHLOSSER PIT <br />N DARY: <br />PERMIT BOU <br />- - - - - - <br />ALLUVIAL VI DEPOSIT <br />, <br />- <br />SECTION 24 <br />.;� SAND AND GRAVEL AVERAGE DEPTH: 20 FEET • <br />f' AVERAGE DEPTH: <br />t _ TOPSOIL 2 FEET <br />f FENCE <br />SCHLOSSER, INC. <br />CHLOSS , <br />`= OVERBURDEN AVERAGE DEPTH: 4 FEET <br />rpt "k. .t� _`UPJ`,} ,',,-• - . .. <br />PIT BOTTOM MATERIAL: CLAY <br />yr »"rt' •;ai - - - -- ' F''--'' ';✓ - <br />e 77. <br />- <br />i <br />- <br />Studv Creek <br />®� FUTURE <br />TOPSOIL <br />F <br />% <br />STOCKPILE PHASE TWO AREA ` <br />TOWNSHIP 16 SOUTH (30 ACRES) <br />Data use subject to license. <br />® Det-orme. Topo North AmericaT"' 9. <br />www.delorme.com <br />C <br />PREVIOUSLY <br />STOCKPILED <br />TOPSOIL <br />LEGEND <br />SECONDARY <br />MINE ADVANCE <br />PHASE TWO <br />FUTURE OVERBURDEN STOCKPILE <br />K -C ELECTRIC TRANSMISSION LINE <br />SCHLOSSER, INC. FENCE <br />AFFECTED LANDS (APPROX. 50 ACRES), <br />PREVIOUSLY <br />MINED AREA <br />APPROX. 6 ACRES <br />Y /s'® <br />INITIAL <br />/11NE AM <br />PHASE ONE <br />I <br />WELL <br />PHASE ONE AREA <br />(20 ACRES) <br />FUTURE OVERBURDEN STOCKPILE <br />J <br />0 <br />(A UJ <br />O n, <br />v <br />0 0 <br />�N <br />=)V <br />Topo North America TM 9 <br />RANGE 44 WEST BOUNDARY BETWEEN PHASE ONE AREA SCHLOSSER, INC. FENCE Pub 1120 <br />AND PHASE TWO AREA <br />' .. - ,' .. , - ice, �F�u � • <br />K -C ELECTRIC ASSN. POWER• <br />TRANSMISSION LINE <br />TN MAP PREPARED BY: Scale t :2,400 <br />ouzo +moo zeo aoo n <br />MNr&7E) RAY LEAHY, MINING ENGINEER CONTOUR INTERVAL: 10 FEET ^ a w m +6 '" <br />t°=2oo.ott Data Zoom 16-4 <br />NOVEMBER 5, 2014 <br />