Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 002 Page 1 of 2 <br />Task description: <br />Site: Deserado Mine <br />BULLDOZER WORK <br />Drill Pads <br />Permit Action: MR165 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 8/10/2015 County: Rio Blanco <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />NA <br />Permit/Job#: C1981018 <br />Abbreviation: None <br />Filename: CO 18-002 <br />Total unit Cost/Hour: $253.73 <br />Total Fleet Cost/Hour: $253.73 <br />MATERIAL QUANTITIES <br />(AVG.) <br />Utilization % <br />Ownership Cost/Hour: <br />$72.57 <br />NA <br />Operating Cost/Hour: <br />$143.16 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $253.73 <br />Total Fleet Cost/Hour: $253.73 <br />MATERIAL QUANTITIES <br />(AVG.) <br />Initial Volume: <br />2,904 <br />Swell factor: <br />1.000 <br />Loose volume: <br />2,904 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />65 feet <br />1,752.8 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 0% <br />Average site altitude: 5,800 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />0.750 <br />(AVG.) <br />0.900 <br />(CAT HB)) <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />