My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-08-10_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2015-08-10_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:09:49 PM
Creation date
8/11/2015 9:18:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
8/10/2015
Doc Name
Adequacy Review
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
MR165
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOTOR GRADER WORK <br />Task description: Regrade and Replace Topsoil on Light Use Road <br />Site: Deserado Mine Permit Action: MR165 Permit/Job#: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 004 State: <br />Date: 8/10/2015 County: <br />User: ZTT <br />Colorado <br />Moffat <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 14M <br />Ripper Attachment: <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: <br />Source of estimated acreage: <br />HOURLY PRODUCTION <br />Abbreviation: None <br />Filename: CO 18-004 <br />Horsepower: 259 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Utilization <br />$42.03 NA <br />$69.88 100 <br />$0.00 <br />$24.47 NA <br />$136.37 <br />$136.37 <br />0.08 <br />MR -163 annlication. <br />acres <br />Average Grader Speed: <br />1.50 <br />mph <br />Selected Application: <br />Finish grading <br />(0-2.5 mph) - 1.5 <br />Selected Blade Angle: <br />30 <br />degrees <br />Effective Blade Length: <br />12.10 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass: <br />10.10 <br />feet <br />Unadjusted Hourly Unit Production: <br />1.8364 <br />acres/hour <br />Job Condition Correction Factors <br />Source <br />1.00 (CAT HB <br />0.90 (1 sh/d, fay.) <br />0.9000 multiplier <br />1.6527 <br />1.6527 <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />Site Altitude: 5280 feet <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Unit cost: $82.51 per acre <br />Total job time: <br />Total job cost: <br />acres/Hour <br />acres/Hour <br />0.05 Hours <br />$7 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.