Laserfiche WebLink
Chris Gilbreath <br />Page 2 <br />completely constructed") rather than at another time in the reclamation process. Also in this paragraph, <br />the second sentence should be re -written; SEDCAD4 does not necessarily consider the worst-case <br />scenario, but that is what the sentence implies as it is currently written. Finally, the word "temporary" is <br />misspelled in this paragraph. <br />ITEM 46. The introductory paragraphs for Section 4.05.13 should indicate that Colowyo submits DMRs <br />as well as AHRs. The data in DMRs are not necessarily contained in AHRs. <br />ITEM 47. On page 7, in sentence that starts "At various times," should the word "obtain" be "detain"? If <br />not, please elaborate on what "obtain" means. <br />ITEM 48. On page 7, in the last sentence on the page, add "and its tributaries" after "Good Spring <br />Creek." <br />ITEM 49. On page 8, the sampling point UTC and other sampling points are not in the table. If these <br />points are no longer sampled, add annotations to Map lOB. <br />ITEM 50. The introductory sentence for Section 4.05.18 appears to contradict the rule. Please re -write <br />the text to agree with the rule and reflect the situation for creeks related to the Collom project. In <br />particular, describe the situation with Little Collom Gulch; it is the Division's understanding that the <br />drainage area for Little Collom is greater than a square mile, and therefore this drainage needs to be <br />addressed in the stream buffer zone discussion. The last sentence in Section 4.05.18 contains an extra <br />word: "are." <br />ITEM 51. Please confirm that there are no power lines near the blasting areas, or, if they do exist, please <br />add this to text in Section 4.08.2. <br />ITEM 52. In Section 4.08.2, the sentence before the heading "Colorado Oil and Gas Registered Facility <br />Locations" is apparently missing some words. Please edit. <br />Table 2.04.9-16 <br />ITEM 53. The following corrections should be made to Table 2.04.9-16. <br />a. The date should be corrected. The table currently reads, "Collom topsoil balance as of March <br />13, 20151". Please correct the date to reflect 2015. <br />b. Line 3 of the table "Lands Yet to Be Retopsoiled (Line 1 Minus 2)" should apparently have a <br />value of 2,352.8 acres. Please explain or correct this line. <br />c. Line 4 appears to be a repeat of Line 3. The descriptions are nearly identical. <br />d. Correction to Lines 3 and 4 will also affect the result of Line 7. Please make the appropriate <br />correction. <br />