Laserfiche WebLink
6 P COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />MINERALS PROGRAM INSPECTION REPORT <br />0 <br />PHONE: (303) 866-3567 <br />s X8"76 <br />'the Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br />noted below. This report documents observations concerning compliance with the terms of the permit <br />and applicable rules and regulations of the Mined land Reclamation Board. <br />MINE NAME: <br />MINE/PROSPECTING ID#: <br />MINERAL: <br />COUNTY: <br />Goose Haven Reservoir #2 <br />M-2010-071 <br />Sand and Gravel <br />Boulder <br />INSPECTION TYPE: <br />INSPECTOR(S): <br />INSP. DATE: <br />INSP. TIME: <br />Monitoring <br />Michael A. Cunningham <br />July 30, 2015 <br />10:00 <br />OPERATOR: <br />OPERATOR REPRESENTATIVE: <br />TYPE OF OPERATION: <br />The City of Lafayette <br />Brad Dallam <br />112c - Construction Regular Operation <br />REASON FOR INSPECTION: <br />BOND CALCULATION TYPE: <br />BOND ANTOUNI T: <br />Normal IB; E Program <br />None <br />NA <br />DATE OF COMPLAINT: <br />POST INSP. CONTACTS: <br />JOINT INSP. AGENCY: <br />NA <br />None <br />None <br />NVEATHER: <br />INS OR' IG. ATURE: <br />SIGNATURE DATE: <br />Clear <br />August 6, 2015 <br />The followinp- inspection topics were identified as having Problems or Possible Violations. OPERATORS <br />SHOULD READ THE F01,L0N17NG PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />NVITH THE TERMS OF TIIE PERMIT AND APPLICABLE RUI.,ES AND REGULATIONS. if a <br />Possible Violation is indicated, you will be notified under separate corer as to when the Mined Land <br />Reclamation Board will consider possible enforcement action. <br />INSPECTION TOPIC: Hydrologic Balance <br />PROBLEM/POSSIBLE VIOLATION: Problem: The Division has no evidence that the operator has a valid well <br />permit, substitute water supply plan, or approved water augmentation plan for the exposed groundwater at the <br />site. This is a problem related to 34-32.5-116(4)(h) of the Colorado Revised Statutes and 3.1.6(1)(a) of the <br />Construction Materials Rules and Regulations governing injury to existing water rights. <br />CORRECTIVE ACTIONS: The operator shall demonstrate that the operation is in compliance with the Office of <br />the State Engineer by the corrective action date. <br />CORRECTIVE ACTION DUE DATE: 8/31/15 <br />INSPECTION TOPIC: Hydrologic Balance <br />PROBLEM/POSSIBLE VIOLATION: Problem: The Operator has failed to follow the approved Mining Plan with <br />respect to the groundwater monitoring plan. This is a problem pursuant to C.R.S. 34-32.5-116(4)(h). <br />CORRECTIVE ACTIONS: The Operator shall provide all available groundwater monitoring data by the corrective <br />action date. <br />CORRECTIVE ACTION DUE DATE: 8/31/15 <br />INSPECTION TOPIC: Gen. Compliance With Mine Plan <br />PROBLEM/POSSIBLE VIOLATION: Problem: The Operator has failed to follow the approved Mining Plan. This is a <br />problem pursuant to C.R.S. 34-32.5-124 of the Construction Materials Rules and Regulations. <br />CORRECTIVE ACTIONS: The Operator shall submit an Amendment to update and clarify the Mining and <br />Reclamation Plans. The Amendment shall address all of the items which are not a part of the approved Mining <br />Pare I of 7 <br />