My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-08-07_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2015-08-07_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:09:48 PM
Creation date
8/7/2015 2:05:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
8/7/2015
Doc Name
Adequacy Response
From
Tri-State Generation and Transmission Association, Inc
To
DRMS
Type & Sequence
PR4
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE SHEET FOR PERMIT REVISIONS, TECHNICAL REVISION, AND MINOR REVISIONS <br />Mine Company Name: Colowyo Coal Company Permit Number: C-1981-019 <br />Date: August 3, 2015 Revision Description: PR -04 Collom <br />Volume Page, Map or other Permit Page, Map or other Permit Description of Change <br />Number Entry to be Entry to be <br />REMOVED ADDED <br />17 <br />No Change <br />18 <br />Page Exh. 7-23A-1 through Exh. 7- <br />Page Exh. 7-23A-1 through Exh. 7- <br />The introduction text for Exhibit 7, Item 23, Part A has been updated in <br />23A-4 (4 pages) <br />23A-4 (4 pages) <br />response to comments. <br />18 <br />Page Exh 7-23A-8 through Exh 7- <br />Page Exh 7-23A-8 through Exh 7- <br />Revise Exh 7-23. Figures A2, A3, A4, and A5, which show the Clean <br />23A-11 (4 pages) <br />23A-11 (4 pages) <br />Water Diversion Ditches, to correct scale bar error <br />18 <br />Pages Exh. 7-23A-36 through Exh <br />Pages Exh 7-23A-36 through Exh <br />The SEDCAD outputs for Exhibit 7, Item 23, Part A have been updated in <br />7-23A-41 (6 pages) <br />7-23A-41 (6 pages) <br />I response to comments. <br />18 <br />Page Exh 7-2313-22 (1 page) <br />Page Exh. 7-23B-22 (1 page) <br />Exhibit 7-23B, Table 1 has been updated in response to comments. <br />18 <br />Exh. 7-23, Figure B1, page Exh. 7- <br />Exh. 7-23, Figure B1, page Exh. 7- <br />Revise Exh. 7-23. Figure B1, the Spoil Pile Collector Ditches, to add a <br />236-5 <br />2313-5 <br />hatch pattern over the Middle Pond Area. <br />18 <br />Page Exh. 7-23C-3 (1 page) <br />Page Exh. 7-23C-3 (1 page) <br />Exhibit 7-23C, Table 1 has been updated in response to comments <br />Revise Exh. 7-23. Figures C1, C2, C3, and C4, which show the Watershed <br />18 <br />Page Exh. 7-23C-6 through Exh. 7- <br />Page Exh. 7-23C-6 through Exh. 7- <br />Boundaries for the West Side and East Side Collector Ditches, to correct <br />23C-9 (4 pages) <br />23C-9 (4 pages) <br />scale bar error, make a legend edit, and modifiey the drainage area for the <br />D2 ditch system. <br />Revise Exh. 7-23. Figures C5, C6, C7, C8 and C9, which provide the <br />18 <br />Page Exh. 7-23C-10 through Exh. <br />Page Exh. 7-23C-10 through Exh. <br />Design Drawings for the 5 ponds to correct typos in the construction notes, <br />7-23C-14 (5 pages) <br />7-23C-14 (5 pages) <br />add labels to the primary spillway and CMP, and to modify the upstream <br />dam face to 3H -1V <br />Page Exh 7-23C-15 through 85 <br />Page Exh 7-23C-15 through 85 <br />West side SEDCAD models for both the 10 year and 100 year cases have <br />18 <br />(70 pages) <br />(70 pages) <br />been modified. After page 46, no changes were made to the East side <br />models, except that have been included due to pagination changes. <br />Figure Exh. 7-23, Figures D1 and <br />Figure Exh. 7-23, Figures D1 and <br />Modified Figures D1 and D2, which show the West Side Pond Access <br />18 <br />D2 <br />D2 <br />Road and the East Side Access Road designs, to revise a construction <br />note <br />Pages Exh. 7-23G-1 through Exh. <br />Pages Exh. 7-23G-1 through Exh. <br />Revised introductory text of the Small Area Exception section for better <br />18 <br />7-23G-27 (27 pages) <br />7-23G-27 (27 pages) <br />clarity regarding modeling done for vegetative filter, revise final SEDCAD <br />model adding conservation inputs. <br />18 <br />Pages Exh. 7-25-1 through Exh. 7- <br />Pages Exh. 7-25-1 through Exh. 7- <br />Revise introductory text for Collom Postmine Channel Design, modified <br />25-3 (3 pages) <br />25-3 (3 pages) <br />peak flow for Reaches 1 and 2 <br />18 <br />Pages Exh. 7-25-11 through Exh <br />Pages Exh. 7-25-11 through Exh. 7 <br />Updated SEDCAD printout for Reaches 1 and 2 models, no other changes <br />7-25-84 (73 pages) <br />25-84 (73 pages) <br />to the other models but the remaining text has been repaginated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.