Laserfiche WebLink
Y <br />Page 4 of 5 <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />Total acres <br />backfilled: <br />�� S <br />Total acres <br />seep ed w/ <br />�� <br />Total acres <br />w/ptopsoil <br />Total acres <br />mulched w/ <br />%, <br />�� <br />yL�lq <br />a roved mix: <br />re laced: <br />a roved mulch: <br />Total acres <br />graded: <br />3 v <br />Total acres <br />fertilized w/ <br />Topsoil <br />replacement <br />j <br />Mulch application <br />rate (tons/ac): <br />dV/ <br />' <br />apvd fertilizer: <br />/ <br />depth (in.): <br />rt <br />Seed <br />Fertilizer <br />Mulch <br />application <br />/// <br />application <br />application <br />method: <br />/v/ <br />method: <br />method: <br />�,, <br />I//� <br />13. Is weed control being conducted in accordance with an approved Weed Control Plan? NO N/A <br />If "YES", indicate the weed species, control area, control type, application rate and treatmenta on the report map. <br />14. Is adequate topsoil reserved for reclamation, based on your approved permit? <br />If "NO", please explain: <br />YES NO N/A <br />15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES NO /A <br />If "NO" please explain: <br />16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of the tate <br />Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO <br />17. Are all hazardous materials stored within approved spill containment structures? YES NO N/ <br />18. Is your financial warranty value sufficient to cover the cost to complete reclamation? NO N/A <br />19. Is your basis for legal right to enter still valid? NO <br />20. Does your permit require you to submit monitoring information annually? YES N/A <br />If "Yes", please attach the required monitoring results to this Annual Report. <br />21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br />Construction Materials (C.R.S. 34-32-116 or 34-32.5-116), attach a map to this report that accurately depicts the <br />permit boundary, current affected area boundary and location of the acreages specified in items 7- 12 and 14. <br />UPDATED <br />MAP ATTACHED: <br />