My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-27_PERMIT FILE - M2015033
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2015033
>
2015-07-27_PERMIT FILE - M2015033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 6:08:55 PM
Creation date
8/6/2015 10:20:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015033
IBM Index Class Name
Permit File
Doc Date
7/27/2015
Doc Name
Application
From
Varra Companies, Inc.
To
DRMS
Email Name
PSH
WHE
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit G — Water Information <br />Water in excess of this mine's and other VCI obligations will be stored and used to <br />replace the water use from November through March. The storage sites are lined pits <br />described in Case No. OICW274 decree. Water available under this storage decree will <br />also be stored and used for VCI operations. The storage facilities are listed in the <br />following table. Those currently lined and approved by the state are 112, Von Ohlen, <br />Dakolios East and Dakolios West. <br />VCI STORAGE FACILITIES (All Values in Acre -Feet) <br />Reservoir Active Capacity, a -f Dead Storage, a -f <br />112 2,000 0 <br />Dakolios 1,900 0 <br />Von Ohlen 1,300 0 <br />Kurtz 4,000 0 <br />5) The Colorado Department of Health has issued Certification for a Colorado Wastewater <br />Discharge Permit System Permit No. COG500000 Facility Number COG -501584. <br />6) The application provides for the lining of the extracted basins (please refer to the AWES <br />Dewatering Evaluation Report of 27 July 2015). Lining will involve the utilization of <br />suitably derived on-site materials to meet final 3H:1 V slopes. Subsequently, the same <br />materials may be compacted to satisfy standards for lined basins as established and <br />governed by the Colorado Department of Water Resources Office of the State Engineer. <br />Once operations near completion of any lined basin, the OSE will be contacted and the <br />lined basins will be approved by the OSE prior to use. The OSE approval letter will be <br />provided to the OMLR as a condition of the permit as evidence that the lined basin has <br />met the specifications necessary to pass a liner test as part of the OSE approval process. <br />Consistent with conclusion in the AWES Report, lining of the completed basins will have <br />will have a de minimis effect on groundwater hydrology.' The report continues, adding <br />that, `Predicted post lining head levels immediately up and downgradient of the barrier <br />walls are within the range of normal seasonal water table elevation changes.' <br />NOTE: Information showing baseline piezometer well readings and respective locations <br />immediately follow this page... <br />Varra Companies, Inc. OMLR 112 Permit Application 3 <br />Parcel 122 — Resource Development Project 1 July 2015
The URL can be used to link to this page
Your browser does not support the video tag.