My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-23_PERMIT FILE - C1981008 (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2015-06-23_PERMIT FILE - C1981008 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:08:38 PM
Creation date
8/5/2015 1:23:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
6/23/2015
Doc Name
Stream Buffer Zones
Section_Exhibit Name
Section 4.05.18
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Enstrom Draw <br />Pond 015 <br />A portion of Pond 015 and the embankment was constructed inside the stream buffer zone for Enstrom <br />Draw. During construction and to date, this has not created any adverse impacts to Enstrom Draw. The <br />pond embankment and areas directly adjacent to the pond have been vegetated and do not exhibit any <br />visual impacts from the presence of the pond and associated structures inside the stream buffer zone. <br />In accordance with Rule 4.05.18, the pond location within the buffer zone has not caused or contributed <br />to a violation of applicable water quality standards. As built, the pond is capturing all surface water <br />runoff from disturbed areas. Likewise, during and after mining, the Pond 015 location will not impact <br />water quantity or quality as it will be removed post mining and reclaimed. Finally, Pond 015 does not <br />create a temporary or permanent stream channel diversion. <br />Ditch C-29 <br />Multiple portions of Ditch C-29 were constructed inside the stream buffer zone for Enstrom Draw. <br />During construction and to date, this has not created any adverse impacts to Enstrom Draw. As <br />constructed, Ditch C-29 functions as a collection ditch which captures surface water runoff from the <br />disturbed and reclaimed areas and conveys surface runoff to an approved sediment control structure <br />(Pond 015). <br />Section 4.05.18 Page 4 March 2015 (TR -68) <br />
The URL can be used to link to this page
Your browser does not support the video tag.