Laserfiche WebLink
Enstrom Draw <br />Pond 015 <br />A portion of Pond 015 and the embankment was constructed inside the stream buffer zone for Enstrom <br />Draw. During construction and to date, this has not created any adverse impacts to Enstrom Draw. The <br />pond embankment and areas directly adjacent to the pond have been vegetated and do not exhibit any <br />visual impacts from the presence of the pond and associated structures inside the stream buffer zone. <br />In accordance with Rule 4.05.18, the pond location within the buffer zone has not caused or contributed <br />to a violation of applicable water quality standards. As built, the pond is capturing all surface water <br />runoff from disturbed areas. Likewise, during and after mining, the Pond 015 location will not impact <br />water quantity or quality as it will be removed post mining and reclaimed. Finally, Pond 015 does not <br />create a temporary or permanent stream channel diversion. <br />Ditch C-29 <br />Multiple portions of Ditch C-29 were constructed inside the stream buffer zone for Enstrom Draw. <br />During construction and to date, this has not created any adverse impacts to Enstrom Draw. As <br />constructed, Ditch C-29 functions as a collection ditch which captures surface water runoff from the <br />disturbed and reclaimed areas and conveys surface runoff to an approved sediment control structure <br />(Pond 015). <br />Section 4.05.18 Page 4 March 2015 (TR -68) <br />