My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-10_HYDROLOGY - M2007044
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2007044
>
2015-07-10_HYDROLOGY - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:09:04 PM
Creation date
8/5/2015 10:22:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
Hydrology
Doc Date
7/10/2015
Doc Name
EF Resources
From
DRMS
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TheestimatedflowrateandmeasuredfieldparametersareincludedinAppendix1, Attachment <br />8ofthisreport, andtheanalyticaldataissummarizedinAppendix2, Table5. <br />WasteRock <br />Noorewasminedandnowasterockwasproducedinthesecondquarter2015. TheMineis <br />currentlyintemporarycessationstatuswithonlymaintenanceandmonitoringactivitiesbeing <br />conducted. EFRIhassuspendedthequarterlywasterocksamplecollectionuntilsuchtimethat <br />miningoperationsresumeandwasterockremovalfromtheMinerecommences. <br />ProductionratesoforeandwasterockaresummarizedinAppendix1, Attachments9and10, <br />respectively. Analyticaldatafrompreviouslycollectedwasterocksamplesaresummarizedin <br />Appendix2, Table6. <br />SedimentPond <br />ThesedimentpondhasbeenmonitoredsinceitsconstructioninNovember2008inaccordance <br />withtheColoradoDivisionofReclamation, Mining, andSafetystipulations. Althoughstorm <br />eventsandsignificantsnowmelteventshaveoccurred, nonehaveresultedinstormwater <br />dischargefrom the pond. <br />Asaresult, nostormwatersampleshavebeencollectedfromthepond <br />todate. EFRIwillcontinuetomonitorthesedimentpondfordischargeandwillcollectsamples <br />intheeventthatadischargeisobserved. <br />DoloresRiver <br />InaccordancewithBLMstipulationstotheMinepermit, theDoloresRiverisrequiredtobe <br />monitoredforseleniumupstreamanddownstreamfromtheconfluenceofLumsdenCreekwhen <br />allofthefollowingconditionsaremet: <br />1) TheMinetreatmentplantisdischargingtreatedwater, <br />2) ThereiscontinuousflowfromthemiddletributaryofLumsdenCreektotheDolores <br />River, and <br />3) SeleniumlevelshavebeeninexceedanceoftheCDPSpermiteffluentlimitsinthepast <br />twoyears. <br />Becausewatertreatmentofminewaterhasbeensuspended, itwasunnecessarytomonitor <br />LumsdenCreekfordischargetotheDoloresRiverinthesecondquarter2015. EFRIwill <br />commencemonitoringtheDoloresRiverfordischargefromLumsdenCreekandtakesamples, <br />asnecessary, atsuchtimethattreatmentanddischargeofminewaterresumes. <br />HydrologicalMonitoringSummar <br />1 RefertoAppendix2, Table7forthehydrologicalcompliancemonitoringsummaryandstatus <br />fortheMine. <br />9
The URL can be used to link to this page
Your browser does not support the video tag.