Laserfiche WebLink
12. Total acres in various stages of reclamation, since permitted mining activities <br /> Total acres Total acres Total acres <br /> backfilled: 39.16 seeded w/ 27.32 w/topsoil 27. <br /> approved mix: replaced: <br /> Total acres Total acres Topsoil <br /> graded: 39.I6 fertilized w/ NA replacement 611 <br /> apvd fertilizer: d5pth (in.): <br /> Seed Dri Iled Fertilizer NA 1V <br /> application application al <br /> method: method: m <br /> 13. Is weed control being conducted in accordance with an approved Weed Conti <br /> If"nS", indicate the weed species, control area, control type, application rat <br /> 14. Is adequate topsoil reserved for reclamation, based on your approved permit? <br /> If"NO", please explain: <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? <br /> If"NCB" please explain: <br /> 16. If mining has exposed groundwater, is the site in compliance with the apprc <br /> Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? <br /> 17. Are all hazardous materials stored within approved spill containment structure <br /> 18. Is your financial warranty value sufficient to cover the cost to complete reclai <br /> 19. Is your basis for legal right to enter still valid? <br /> 20. Does your permit require you to submit monitorimE information annualiv? <br />