My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-08-04_HYDROLOGY - M1999098
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1999098
>
2015-08-04_HYDROLOGY - M1999098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:09:43 PM
Creation date
8/5/2015 8:33:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999098
IBM Index Class Name
HYDROLOGY
Doc Date
8/4/2015
Doc Name
Corrective Action Extension
From
Aggregate Industries
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
X50 <br />July 31, 2015 <br />,-- AUG 0 4 ZG 15 <br />DIVISION OF RECLAMATION <br />MINING AND SAFETY <br />Mr. Peter S. Hays <br />Division of Reclamation, Mining & Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />V <br />Re: Permit No. M-1999-098 — Riverview Resource <br />, Corrective Action Extension Request Regarding Cell 3 Breach Repair <br />Dear Peter: <br />AL <br />AGGREGATE <br />INDUSTRIES <br />Aggregate Industries (AI) submits this letter in response to the Division's inspection report of the <br />Riverview Resource operation on June 26, 2015. The Division cited as a problem that Al failed <br />to repair a damaged section of the northern bank of the southeast section of Cell 3 resulting in <br />increased flood flows into a neighboring property. The corrective action required by the <br />Division is to repair the breach, re -survey the section to verify topography and submit the survey <br />results to the Division by August 3, 2015. <br />AI's contractor for conducting the work was not available until this week. He has been working <br />on re-establishing access to the breach section the past three days and is in the process of <br />repairing the breach today. He expects to have that work completed by today. Al expects to be <br />able to notify the Division of the repair completion on (August 3 but is requesting an extension of <br />the corrective action due date to August 17 to allow time to complete the required survey and <br />submit the results. <br />Thank you for your consideration in this matter. <br />Very truly yours, <br />Connie N. Davis <br />Land Advisor <br />Aggregate Industries <br />West Central Region, Inc. <br />1687 Cole Boulevard, Suite 300 <br />Golden, CO 80401 <br />Telephone: 303-985-1070 <br />An Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.