Laserfiche WebLink
4ENLECA <br />103 Coal Company <br />Seneca Coal Compan <br />July 23, 2015 <br />RECEIVED <br />Ms. Janet Binns, <br />JUL 3 0 2015 <br />Division of Reclamation, Mining and Safety Division of Reclamation, <br />1313 Sherman Street, Room 215 Mining & Safety <br />Denver, CO 80203-2273 <br />RE: Seneca II -W Mine (C-82-057) Quarterly Stockpond Inspections <br />Dear Ms. Binns, <br />Enclosed are the second quarter 2015 stockpond inspections for those structures at Seneca II -W which <br />have been constructed to date. Inspections for Stockponds T-1, T-2, T-3, T-5, T-18, T-20, T-22, T-24, T- <br />25, T-26 and T-27 are included. Should you have any questions, please call Scott Cowman at 970-276- <br />7003. <br />Enclosure(s) <br />Sincerely, <br />9 <br />Dennis Jones <br />Consultant <br />Seneca Coal Company a P.O. Box 670 a Hayden, Colorado 81639 <br />Telephone (970) 276-7003 • FAX (970) 276-7020 <br />