Laserfiche WebLink
)rti�L <br />..Co <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />IS *�76 * 1313 Sherman Street, Room 215, Denver, Colorado 80203 ph(303) 866-3567 <br />_T" T REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br />File No.: M- 1979075 <br />County Garfield <br />Site Name: Chambers Pit <br />TR# (DRMS Use only) <br />Permittee: Old castle SW Group, Inc. dba United Companies <br />Operator (If Other than Permittee): Q F (i r i\ f E D <br />Permittee Representative: Jason Burkey „„ 4 n 2016, <br />Please provide a brief description of the proposed revision: r,n ,aims OE fxri1l l" <br />Data to satisfy the outstanding conditions of TR 03. MINING AWW <br />tff <br />AF & Report <br />J Violations <br />MV1990038 5/31/1990 <br />As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. If the Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre -defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Type Required TR Fee Submitted (mark only one) <br />110c, 111, 112 construction 71materials, and 112 quarries $216 <br />112 hard rock (not DMO) $175 ❑ <br />110d, 112d(1, 2 or 3) $1006 ❑ <br />