Laserfiche WebLink
BOREHOLE SEALING WORK <br />Tasks: M1 <br />Mina: Hansen Uranium Project <br />Permit no.: P-2009-025 <br />peritting action: M0.01 <br />Date: 4/18/12 <br />Prepared by: TAK <br />Task 4498 - Page 1 of 1 <br />MJ <br />Cwt of bulk cement <br />2,500 gal <br />w/ <br />octoplug Cut surface <br />Total coat <br />Nob <br />Hole <br />(assuming 94 lbe of <br />Cement coal <br />Total rig Rig W crow <br />water truck <br />truck <br />(Circes, casing a <br />before bond <br />Hole dbm, <br />Total <br />volume <br />cement per 1.15 d of <br />per cartw/drlver <br />Cement <br />Rig setup time Rig time to <br />rate <br />time hourly re <br />Total rig <br />driver cost <br />$19.57 mark <br />% Limb. release or Total cost <br />(a) <br />depth (ft)(c <br />f) <br />hole, that to 100 The <br />(CIRCES) <br />M41 coat <br />per hole (hr) fill hole <br />(setup + (Groes, Reed <br />coat <br />hourly rate <br />fill <br />per in. (Circes, <br />increment <br />of cement fills 1.25 <br />fin) drill, 9.0") <br />(Circes) <br />Utkm e x <br />diam.) $10.90IIQ <br />obligation <br />of) <br />truck rats) <br />9 holes, additional 18 inches diameter, over <br />30 -ft interval <br />6' diem., previously bonded 6 <br />270 <br />53 <br />42 <br />$10.90 <br />$462 <br />0.53 <br />0.53 $133.59 <br />$71 <br />$63.70 <br />$34 <br />100% $567 $567 <br />24' diem., not bonded 24 <br />270 <br />848 <br />678 <br />$10.90 <br />$7,395 <br />8.48 <br />8.48 $133.59 <br />$1,133 <br />$63.70 <br />$540 <br />100% $9.066 $+9,068 <br />9.01 dg hours <br />Grand Total (24' diem., minus 6' diem) $8,502 <br />/I rigs <br />4.51 project hours <br />Task 4498 - Page 1 of 1 <br />MJ <br />