My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-30_HYDROLOGY - M2001005
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2001005
>
2015-07-30_HYDROLOGY - M2001005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:09:30 PM
Creation date
7/31/2015 12:01:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001005
IBM Index Class Name
HYDROLOGY
Doc Date
7/30/2015
Doc Name
Re: Renewal Request
From
DWR
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 3 <br />Transit Mix - Grisenti Gravel Pits <br />Replacement Sources (2015-2017) <br />(all values in acre-feet) <br />Notes: <br />[I] Total Lagged Mining Depletions from Table I, column [I1]. <br />121 Historical Irrigation Credit from Table 2. columns 1121 and [ 131. Negative values represent historic stream accretions. <br />13] Historical Irrigation Credits are diverted through the Lester-Attebury Ditch to the phase I pond where the water is lagged back to the river. <br />Lagged Historical Irrigation Credits to the River were projected to account fnr timing of irrigation credits accruing to the river. <br />141 Replacement Requirements equal to maximum of ([ 11- [21- 13]) and zero if [21 is negative, and calculated as maximum of Q 11- [31) and <br />zero if 121 is positive. <br />15] Excess credits equal 131- [11 if the difference is positive and 121 is positive else, equal to 131- [21- [1 J if the difference is positive and [21 is <br />negative, else zero. <br />[61 Twin Lakes Release Requirement includes a 7.81%Transit loss based upon a loss of 0.07% per mile over 111.6 mites. <br />s, BBA <br />wnc�tp+nwlum� BISIOOF-BROGOEN ASSOCIArrf. INC. teulei 0a 1117=14 PIH <br />Total Lagged <br />Historical <br />Lagged Historical <br />Remaining <br />Twin Lakes <br />Mining <br />Irrigation <br />Irrigation Credits <br />Replacement <br />Excess <br />Release <br />Depletions <br />Cn dit_s0ebts <br />to the River <br />Requirements <br />Credits <br />Requirements <br />Month <br />01 <br />1213 <br />4l <br />151 <br />f6l <br />Feb -15 <br />4.89 <br />-1.74 <br />0.00 <br />6.63 <br />7.19 <br />Mas -15 <br />6.74 <br />-1.68 <br />0.10 <br />8.42 <br />9.13 <br />Apr -15 <br />9.86 <br />9.44 <br />5.31 <br />4.55 <br />4.93 <br />May -15 <br />13.63 <br />27.17 <br />18.91 <br />0.00 <br />5.29 <br />0.00 <br />Jun -15 <br />17.90 <br />28,56 <br />27,00 <br />0.00 <br />9.10 <br />0.00 <br />Jul -15 <br />19.06 <br />32.33 <br />30.61 <br />0.00 <br />11.55 <br />0.00 <br />Aug -15 <br />17.38 <br />22.40 <br />26.53 <br />0.00 <br />9.15 <br />0.00 <br />Sep -15 <br />14.69 <br />16.67 <br />19.71 <br />0.00 <br />5.02 <br />0.00 <br />Oct -15 <br />11.15 <br />13.71 <br />15.31 <br />0.00 <br />4.16 <br />0.00 <br />Nov -15 <br />7.29 <br />-5.16 <br />6.15 <br />6.30 <br />6.83 <br />Dec -15 <br />5.34 <br />-3.00 <br />0.74 <br />7.61 <br />8.26 <br />Jan -16 <br />4.99 <br />-2.31 <br />0.00 <br />7.30 <br />7.92 <br />15-16 Total <br />132.92 <br />136.39 <br />150.27 <br />40.81 <br />44.27 <br />44.26 <br />Feb -16 <br />5.68 <br />-1.74 <br />0.00 <br />7.43 <br />8.06 <br />Mar -16 <br />7.46 <br />-1.68 <br />0.00 <br />9.14 <br />9.91 <br />Apr -16 <br />11.05 <br />9.44 <br />5.31 <br />5.74 <br />6.22 <br />May -16 <br />15.32 <br />27.17 <br />18.91 <br />0.00 <br />3.59 <br />0.00 <br />Jun -16 <br />20.20 <br />28.56 <br />27.00 <br />0.00 <br />6.80 <br />0.00 <br />Jul -16 <br />21.40 <br />32.33 <br />30.61 <br />0.00 <br />9.21 <br />0.00 <br />Aug -16 <br />19.43 <br />22.40 <br />26.53 <br />0.00 <br />7.10 <br />0.00 <br />Sep -16 <br />16.36 <br />16.67 <br />19.71 <br />0.00 <br />3.35 <br />0.00 <br />Oct -16 <br />12.32 <br />13.71 <br />15.31 <br />0.00 <br />2.99 <br />0.00 <br />Nov -16 <br />7.94 <br />-5.16 <br />6.15 <br />6.95 <br />7.54 <br />Dec -16 <br />5.79 <br />-3.00 <br />0.74 <br />8.06 <br />8.74 <br />Jan -17 <br />5.43 <br />-2.31 <br />0.00 <br />7.73 <br />8.39 <br />16-17 Total <br />148.39 <br />136.39 <br />150.27 <br />45.04 <br />33.04 <br />48.86 <br />Notes: <br />[I] Total Lagged Mining Depletions from Table I, column [I1]. <br />121 Historical Irrigation Credit from Table 2. columns 1121 and [ 131. Negative values represent historic stream accretions. <br />13] Historical Irrigation Credits are diverted through the Lester-Attebury Ditch to the phase I pond where the water is lagged back to the river. <br />Lagged Historical Irrigation Credits to the River were projected to account fnr timing of irrigation credits accruing to the river. <br />141 Replacement Requirements equal to maximum of ([ 11- [21- 13]) and zero if [21 is negative, and calculated as maximum of Q 11- [31) and <br />zero if 121 is positive. <br />15] Excess credits equal 131- [11 if the difference is positive and 121 is positive else, equal to 131- [21- [1 J if the difference is positive and [21 is <br />negative, else zero. <br />[61 Twin Lakes Release Requirement includes a 7.81%Transit loss based upon a loss of 0.07% per mile over 111.6 mites. <br />s, BBA <br />wnc�tp+nwlum� BISIOOF-BROGOEN ASSOCIArrf. INC. teulei 0a 1117=14 PIH <br />
The URL can be used to link to this page
Your browser does not support the video tag.