CRIPPLE CREEK & VICTOR GOLD MINING Co. Icy <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />B) Underground Workings: <br />UG #6531: Sandvik 700 & 800 track drills continued drilling blast pattern for geogrid subgrade. <br />Shot for preparation of geogrid subgrade. Further remediation required. <br />UG #6455: Sandvik 700 & 800 track drills continued drilling blast pattern for geogrid subgrade. <br />Further remediation required. <br />UG #6689: The working was excavated approximately 25' to competent rock. The site was <br />backfilled per project specifications. Remediated. <br />UG #6429: Additional two geogrid layers placed to compensate for depression in previously <br />placed geogrid. Two layers of Select Structural Fill placed and compacted per project plans and <br />specifications. Remediated. <br />UG #6004: Step 3 — First, second and third layer of geogrid placement complete. First, second <br />and third layer of Select Structural Fill placed and compacted per project plans and specifications. <br />Step 4 — First, second and third layer of geogrid placement complete. First, second and third <br />layer of Select Structural Fill placed and compacted per project plans and specifications. <br />Remediated. <br />C) Geomembrane: <br />Geomembrane installation within Phase 1 continued this week performing deployment, seaming, <br />repair, and QA/QC activities. Approximately 386,363 square feet of 80mil LLDPE geomembrane <br />was deployed. Soil Liner Fill was inspected and approved by AMEC, Ames and ECA <br />representatives prior to geomembrane deployment. Approximately 17,357 linear feet of seam <br />was fusion welded during deployment using one or two fusion welding machines for each day of <br />deployment. Approximately 1,021 linear feet of seam was extrusion welded during deployment. <br />Destructive and non-destructive testing was completed in compliance with project technical <br />specifications. <br />Ames continuously excavated anchor trench ahead of geomembrane installation. After <br />geomembrane testing was completed, the anchor trench above finished panels was backfilled <br />and compacted per project specifications. <br />See attached figure for approved geomembrane. <br />II) Storm Water Management <br />Best Management Practices (BMPs) continued to be performed. <br />