My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-30_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-07-30_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:09:30 PM
Creation date
7/31/2015 11:51:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
7/30/2015
Doc Name
Weekly QA Report
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. I II <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Number: 74201125N0 <br />Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: July 18, 2015 <br />Location: Cripple Creek & Victor Gold Mine, CO <br />Contractor: Ames Construction, Inc. <br />Reporting Period: 7.12.2015 through 7.18.2015 <br />Ambient Temperature Ranges During Week Weather Conditions During Week: <br />Highs: 69°F to 72°F Cloud Cover: Cloudy to Mostly Cloudy <br />Lows: 44°F to 48°F Precipitation: Rain <br />Wind: Calm to moderate <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF). <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1) Earthworks <br />A) VLF (PSSA, Phase 1, and 2) <br />Structural Fill: <br />The following Structural Fill haul to fill and grading activities occurred: <br />A Cat 330 excavator removed spoils from between stations FM8+00 to FM12+00 and DDO+50 to <br />DM1+00. Cat 740 haul trucks transported the Structural Fill material to the fill area. A GPS <br />equipped Cat D8 dozer placed Structural Fill between stations F26+00 and F28+00. A Cat <br />smooth drum roller compacted the Structural Fill per project plans and specifications. <br />CC&V hauled material to the Dump 4 surge in Phase 2 using Cat 793 haul trucks. A Cat D10 <br />dozer placed the Structural Fill between stations N20+00 and N22+00. A Cat smooth drum roller <br />compacted the fill area. <br />Cat dozers graded the slope between stations D8+00 to D10+00, DMO+00 to DM2+00 and <br />FM8+00 to FM 13+50. <br />Cat smooth drum rollers compacted subgrade between stations DDO+00 to DD2+00, FFO+00 to <br />FM14+00 and HM16+00 to HM20+00. Two Cat smooth drum rollers connected to a pulley <br />anchored with a Cat dozer compacted subgrade below stations G3+00 to G4+00. <br />All of the above Structural Fill material was placed, compacted, and graded per the project plans <br />and specifications. <br />Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D <br />D <br />D <br />D=Day Shift N=Night Shift W= Weather <br />Ambient Temperature Ranges During Week Weather Conditions During Week: <br />Highs: 69°F to 72°F Cloud Cover: Cloudy to Mostly Cloudy <br />Lows: 44°F to 48°F Precipitation: Rain <br />Wind: Calm to moderate <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF). <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1) Earthworks <br />A) VLF (PSSA, Phase 1, and 2) <br />Structural Fill: <br />The following Structural Fill haul to fill and grading activities occurred: <br />A Cat 330 excavator removed spoils from between stations FM8+00 to FM12+00 and DDO+50 to <br />DM1+00. Cat 740 haul trucks transported the Structural Fill material to the fill area. A GPS <br />equipped Cat D8 dozer placed Structural Fill between stations F26+00 and F28+00. A Cat <br />smooth drum roller compacted the Structural Fill per project plans and specifications. <br />CC&V hauled material to the Dump 4 surge in Phase 2 using Cat 793 haul trucks. A Cat D10 <br />dozer placed the Structural Fill between stations N20+00 and N22+00. A Cat smooth drum roller <br />compacted the fill area. <br />Cat dozers graded the slope between stations D8+00 to D10+00, DMO+00 to DM2+00 and <br />FM8+00 to FM 13+50. <br />Cat smooth drum rollers compacted subgrade between stations DDO+00 to DD2+00, FFO+00 to <br />FM14+00 and HM16+00 to HM20+00. Two Cat smooth drum rollers connected to a pulley <br />anchored with a Cat dozer compacted subgrade below stations G3+00 to G4+00. <br />All of the above Structural Fill material was placed, compacted, and graded per the project plans <br />and specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.