My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-04_PERMIT FILE - C1981008 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2015-06-04_PERMIT FILE - C1981008 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:01:25 PM
Creation date
7/30/2015 9:11:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
6/4/2015
Doc Name
Topsoil Handling, Stockpiling and Redistribution
Section_Exhibit Name
Section 2.05.4(2)(d) Topsoil Handling, Stockpiling and Redistribution
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14.0 Topsoil Suitability Criteria and Testing Plan for Reclaimed Soils <br />Prior to distribution of topsoil, all graded mined areas (on which topsoil is to be applied) will be sampled <br />to confirm spoil suitability (see Regraded Spoil Monitoring Plan in subsection 4.0 of this section for more <br />details). The density and physical characteristics of the replaced topsoil and upper spoil will be observed. <br />The suitability criteria is required to ensure that no poor topsoil or subsoil is placed near the surface of any <br />reclaimed area and that prime farmlands are restored to strict standards for high productivity. <br />Soil suitability criteria for all non prime farmland areas west of 2700 Road are addressed in Table <br />2.05.4(2)(d)-1. Soil suitability for prime farmlands is addressed is Section 2.06.6. <br />Depth measurements shall be taken at the same locations as the original sample sites. The topsoil salvage <br />and replacement depth information will be kept on file at the mine office and will be submitted with the <br />Annual Topsoil Balance/Spoil Quality Report to DRMS. Topsoil recovery depths will be adjusted if <br />warranted by the site conditions. Sample frequency is as shown in the table for each material type. <br />15.0 Topsoil Remediation Plans <br />In the event that any one soil sample result exceeds the limits, WFC will implement the topsoil remediation <br />plan below. <br />If one or more parameters fall within the unsuitable range at a given grid point, a three-part mitigation plan <br />will be implemented. <br />1. The area around a suspect hole will be sampled on a closer spacing interval in order to better <br />define the lateral extent and variability of the unsuitable material. This sampling will be called the <br />2nd Phase sampling and the interval is one hole per 50 feet distance around the bad point in all <br />directions for prime farmland, and one hole per 100 feet distance around the bad point in all <br />directions for reclaimed irrigated pastureland and dryland pasture. <br />August 2013 (PR -08) 2.05.4(2)(d)-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.