My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-04_PERMIT FILE - C1981008 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2015-06-04_PERMIT FILE - C1981008 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:01:25 PM
Creation date
7/30/2015 9:11:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
6/4/2015
Doc Name
Topsoil Handling, Stockpiling and Redistribution
Section_Exhibit Name
Section 2.05.4(2)(d) Topsoil Handling, Stockpiling and Redistribution
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Topsoil/Subsoil Balance (CY) <br />Mixed Topsoil <br />Lift A Topsoil4 <br />Lift B Topsoil <br />Zone 1 <br />0 <br />0 <br />0 <br />Zone 2 <br />0 <br />0 <br />0 <br />Zone 2A <br />0 <br />621 <br />0 <br />Zone 3 <br />0 <br />9,435 <br />14,582 <br />Zone 4 <br />N/A <br />N/A <br />N/A <br />Soil to be placed <br />0 <br />10,056 <br />14,582 <br />Already Placed' <br />0 <br />0 <br />0 <br />Stockpiled' <br />0 <br />10,429 <br />16,157 <br />Soil Available <br />0 <br />10,429 <br />16,157 <br />Soil Balance <br />0 <br />373 <br />1,575 <br />'From Topsoil/Subsoil Available table. <br />2Combintation of Already Placed and Stockpiled categories. <br />'Soil Available minus Soil to be placed. This shows that the plan can be accomplished with the soil on site, but it does not mean <br />that there will be soil left over. All soil will be used to reclaim according to this plan. <br />4Zone 2A will receive Lift A Topsoil at a depth to be determined by the landowner. The thickness shown in the table above is for <br />calculation purposes to demonstrate an adequate amount of topsoil is available to reclaim Zone 2A. <br />As can be seen from Table 2.05.4(2)(d)-3, there is sufficient topsoil and subsoil volume in the stockpiles <br />to complete the topsoil redistribution plan. Since stockpiled soil had rock fragments removed during <br />stripping, the recovery from stockpiles is treated as 100%. The basic calculation of the topsoil required in <br />a given zone is: <br />Topsoil Needed = <br />Zone Area (ac) * 43,560 fry * Soil Thickness (in) <br />12 U1ft * 27 fi3 3,d3 <br />The size of the stockpiles is determined via detailed surveys conducted on site. All soil thicknesses are <br />designed to the nearest inch, since this is the practical measurement limit for the scale of equipment used <br />at the New Horizon Mine. <br />12.2 North of BB Road/West 2700 Road <br />These lands include all lands north of BB Road and west of 2700 Road except for the 4.76 acres of prime <br />May 2015 (MR -94) 2.05.4(2)(d)-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.