My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-21_REPORT - C1996083
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2015-07-21_REPORT - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:09:17 PM
Creation date
7/29/2015 12:53:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Report
Doc Date
7/21/2015
Doc Name
2nd Quarter 2015 Wastebank Report
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CWDA No. 2 <br />#01349 -0001 Huddleston-Berry <br />07/21/15 (aCn&1m, & r 6t%. uc <br />The recorded increases in pore pressures at VWP -08 during the spring, summer, and fall 2014 <br />are consistent with the fact that gob placement has occurred in the vicinity of this instrument <br />during that time. Since September 2014, the pore pressures in VWP -08 have changed very little. <br />The current pore pressure reflects a piezometric surface elevation of approximately 6097 feet <br />which is much less than the critical elevation of 6113 feet. As a result, HBET does not believe <br />that the measured pore pressures in VWP -08 are any indication of instability in CWDA No. 2. <br />VWP -n 9 <br />VWP -09 was installed on May 18, 2012 near the toe of CWDA No. 2. The pore pressures <br />recorded at VWP -09 have been fairly steady since installation. This suggests that dewatering of <br />the gob in this area is likely nearly complete. It is anticipated that the pore pressures at VWP -09 <br />will remain fairly steady over time. <br />VWP -10 <br />VWP -10 was installed on May 18, 2014 near the toe of CWDA No. 2. The pore pressures <br />recorded at VWP -10 have been fairly steady since installation. This suggests that dewatering of <br />the gob in this area is likely nearly complete- It is anticipated that the pore pressures at VWP -10 <br />will remain fairly steady over time. <br />Site Visit Observations <br />HBET visited the site on June 12, 2015. At the time of our visit, the mine was idle. The <br />windrows of material previously observed in the drying area on top of CWDA No. 2 were not <br />present. No wet material was being transported from the wash plant; however, gob was being <br />moved around and compacted on CWDA No. 2. In general, CWDA No. 2 appeared to be in <br />good condition and no evidence of instability or other adverse conditions were observed. <br />General <br />In general, based upon the results of the recent VWP and inclinometer monitoring data, and upon <br />our observations at the site, HBET does not believe that there is any reduction in the stability of <br />CWDA No. 2. Continued quarterly monitoring of piezometers and inclinometers is <br />recommended. <br />We are pleased to be of service to your project. Please contact us if you have any questions or <br />comments regarding the contents of this report. <br />Respectfully Submitted: <br />Huddleston -Berry Engineering and Testing, LLC <br />Michael A. Berry, P.E. <br />Vice President of Engineering <br />X:\2008 ALL PROJECTS \01349 -Bowie Resources, LM01349 -0001 Bowie Mine\200 - Geo \Gob 2\Imtr ntation Monitoring\2015 \01349 -0001 GP2 LR072115.doe 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.