My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-27_REVISION - M1980183
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980183
>
2015-07-27_REVISION - M1980183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:16:29 PM
Creation date
7/28/2015 11:08:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980183
IBM Index Class Name
REVISION
Doc Date
7/27/2015
Doc Name
Preliminary Adequacy Review AM02
From
DRMS
To
Brannan Sand & Gravel
Type & Sequence
AM2
Email Name
TOD
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd <br />Task # 001 Page 2 of 2 <br />Visibility: <br />AVG. <br />1.000 <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />0.900 <br />(SSD-FC) <br />Push gradient: <br />0.666 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />0.793 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.3515 <br />Adjusted unit 480.32 LCY/hr <br />production: <br />Adjusted fleet 960.64 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.528/LCY <br />Total job time: 474.02 Hours <br />Total job cost: $240,639 <br />
The URL can be used to link to this page
Your browser does not support the video tag.