My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-27_REVISION - M1980183
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980183
>
2015-07-27_REVISION - M1980183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:16:29 PM
Creation date
7/28/2015 11:08:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980183
IBM Index Class Name
REVISION
Doc Date
7/27/2015
Doc Name
Preliminary Adequacy Review AM02
From
DRMS
To
Brannan Sand & Gravel
Type & Sequence
AM2
Email Name
TOD
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: Reclaim Pit 29 <br />Site: Pit 29 <br />PROJECT IDENTIFICATION <br />COST SUMMARY WORK <br />Permit Action: AM02 Permit/Job#: M1980183 <br />Task #: 999 State: Colorado <br />Date: 7/24/2015 County: Adams <br />User: TOD <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: M183-999 <br />Task <br />Form <br />Description Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />007 <br />Grade all slopes in Areas II and III to 311:1 V or DOZER <br />flatter <br />2 <br />1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />474.02 <br />$240,639.00 <br />$7,986.00 <br />$24,223.00 <br />$600,000.00 <br />$147,500.00 <br />$58,527.00 <br />$4,946.00 <br />Weed control, entire site REVEGE <br />24.00 <br />Grade fines in mining area III DOZER <br />47.71 <br />Riprap banks cost from AM -01 NA <br />40.00 <br />Construct french drain (cost from AM -02) NA <br />160.00 <br />Revegetation of entire Site REVEGE <br />165.00 <br />Mobilization/Demobilization MOBILIZE <br />4.88 <br />SUBTOTALS: <br />915.61 <br />$1,083,821 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />2.02% <br />Total = <br />$21,893.18 <br />1.05% <br />Total = <br />$11,380.12 <br />200.00 hrs <br />Total = <br />$15,032.00 <br />10.00% <br />Total = <br />$108,382.10 <br />TOTAL O & P = <br />$156,687.40 <br />CONTRACT AMOUNT (direct + O & P) = <br />$1,240,508.40 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contractibid preparation: <br />Reclamation management and/or administration: <br />500.00 <br />6.00% <br />5.00% <br />CONTINGENCY: 0.00 <br />Total = 500.00 <br />Total = $74,430.50 <br />$62,025.42 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $293,643.32 <br />TOTAL BOND AMOUNT (direct + indirect) = $1,377,464.32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.