My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-27_REPORT - M1982075
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1982075
>
2015-07-27_REPORT - M1982075
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2016 10:47:51 AM
Creation date
7/28/2015 11:03:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982075
IBM Index Class Name
REPORT
Doc Date
7/27/2015
From
Alvin Mosch
To
DRMS
Annual Report Year
2015
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Yes this site operates for more than 180 days per year. <br />6. Has this mine been granted: <br />a) Approval of TEMPORARY CESSATION Status? <br />This mine site has not been granted approval for Temporary Cessation. <br />b) Approval for INTERMITTENT OPERATION? <br />This mine site has not been granted approval for Intermittent Operation. We would <br />like to apply for this status. Please let us know how to do this. <br />7. Number of acres currently affected (mining + incomplete and or unreleased <br />reclamation). <br />The total acreage of affected land by the Phoenix Mine activities is 0.447 Acres <br />8. Number of acres that were newly affected during the current report year. <br />No new lands were affected this year at the Phoenix mine site. All excavation from <br />mining activities has been placed in dry underground stopes. <br />9. Number of acres that were reclaimed during the current report year. <br />No acreage was reclaimed at this mine site this last year. <br />10. Estimated new acreage to be affected in the next report year. <br />No new land is planned to be disturbed in the coming year. <br />11. Estimated acres to be reclaimed in the next report year. <br />No reclamation activities are planned for the coming year. <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />Total acres backfilled: <br />Total acres seeded w/approved mix: <br />Total acres w/topsoil replaced: <br />Total acres mulched w/approved mulch: <br />Total acres graded: <br />
The URL can be used to link to this page
Your browser does not support the video tag.