Laserfiche WebLink
Cost Summary Worksheet Cont'd <br />Task # 000 <br />Page 6 of 8 <br />Dozing method: <br />(GEN.) <br />1.000 <br />Visibility: <br />1.000 <br />(AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />0.900 <br />(SSD -FC) <br />Push gradient: <br />1.000 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />1.438 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.8056 <br />Adjusted unit production: 241.68 LCY/hr <br />Adjusted fleet production: 241.68 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0344/LCY <br />Total job time: 3.33 Hours <br />Total job cost: $277 <br />CRCES Cost Estimating Software <br />