Laserfiche WebLink
k , <br />While TC discusses reclamation of the proposed disturbance in the revised pages submitted with MR - <br />288, TC did not revise the reclamation plan in Section 2.05.4 of the permit. Please submit appropriate <br />revised pages to the reclamation plan to accountfor the additional disturbance. <br />Response: Reclamation for the proposed 5MN Pipelines is discussed (as noted above) on page 2.05- <br />45.27, and is addressed by the Section 2.05.4 discussion of "Drillhole or Well Plugging and Sealing, <br />and Well and Pipeline Reclamation and Abandonment" on pages 2.05-106.2 and 109.3 (MR10-249). <br />Status: Resolved. <br />