Laserfiche WebLink
J� 4 <br />TWENTYMILE COAL, LLC - FOIDEL CREEK MINE <br />MR15-2889 5 MAIN NORTH PIPELINES <br />COMPLETENESS RESPONSES (07/15) <br />1) The Summary of Revisions and Additions table submitted with MR -288 indicated Twentymile Coal, <br />LLC (TC) proposes to replace pages 2.05-45.21, 45.22, 45.23, 45.24, and 45.25. These pages were <br />not submitted with MR -288. Please submit these pages or revise the Summary of Revisions and <br />Additions table. <br />Response: The Summary of Revisions and Additions has been revised, and a copy is attached. Please <br />note that this Summary is provided as a courtesy to simplify and facilitate review and processing, and <br />is not a required part of the application, thus, should not be a completeness consideration. <br />Status: Resolved. <br />2) Map 23c needs to be revised and updated to account for the surface disturbance associated with <br />MR -288. <br />Response: Map 23C includes (as indicated by the legend); an outline of the underground mine <br />workings, the railroad spur, roads, surface impoundments, and water monitoring locations. It does not <br />show mine facilities, so it would not be appropriate to include the proposed pipeline locations on this <br />map. The pipeline locations are, however, shown on Map 24, Structures and Facilities, copies of <br />which were included with the revision submittal. <br />Map 23C is titled, "Mine Plan Surface Disturbance and Monitoring", and as outlined in the <br />Legend, the disturbed area acreage is depicted on this map. The application indicates the <br />disturbed area will increase 4.6 acres, and thus this map needs to be revised to account for this <br />disturbed area. This issue remains outstanding and will need to be addressed. <br />Response 2: The discrepancy between the Division's initial comment, TC's initial response, and the <br />Division's follow-up comment was discussed by phone, and it was determined that the Division and <br />TC were looking at different versions of Map 23C. Map 23C has been updated to show the 5MN <br />Pipeline disturbance, and copies of the revised map accompany this response. <br />3) TC indicated they are revising Exhibit 23C with a Colorado Parks and Wildlife (CP99 <br />consultation letter. This letter was not included with the submittal of MR -288. Please submit this <br />letter and indicate how it should be incorporated into Exhibit 23C. <br />Response: The areas potentially affected by the proposed temporary disturbance associated with the 5 <br />Main North Pipelines fall within areas previously reviewed for potential wildlife impacts and <br />addressed by previous CDOW, USFWS, and CPW consultations (6 Main North Ventilation Shaft <br />Installation (TR05-48), 6 Main North Reservoir (TR05-61), and 5 Main North Cement Borehole <br />(MR14-283)). Documentation for those consultations are provided with these responses, to be inserted <br />in Exhibit 23C, at the front of the Exhibit. <br />Status: Resolved. <br />