My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-22_REPORT - M1980244 (6)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-07-22_REPORT - M1980244 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:09:18 PM
Creation date
7/23/2015 10:33:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
7/22/2015
Doc Name
Weekly Report
From
Cripple Creek & Victor
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />FQ. ANGLOGOLD ASHANTI (COLORADO) <br />SQUAW GULCH (VLF) WEEKLY REPORT <br />IT <br />1� <br />amec <br />foster <br />wheeler <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Number: 74201125N0 <br />Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: July 11, 2015 <br />Location: Cripple Creek & Victor Gold Mine, CO <br />Contractor: Ames Construction, Inc. <br />Reporting Period: 7.5.2015 through 7.11.2015 <br />Days <br />S <br />M <br />T I W <br />T F <br />S <br />Work Shifts4111 <br />D <br />D D <br />D D <br />D <br />D=Day Shift N=Night Shift W= Weather <br />ORECEIVED <br />&,-'JUL 222015 <br />DIVISION OF RECLAMATION <br />MINING AND SAFETY <br />Ambient Temperature Ranges During Week Weather Conditions During Week: <br />Highs: 50°F to 69°F Cloud Cover: Cloudy to Mostly Cloudy <br />Lows: 41 °F to 48°F <br />Precipitation: Rain <br />Wind: Calm to moderate <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF). <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1) Earthworks <br />A) VLF (PSSA, Phase 1, and 2) <br />Structural Fill: <br />The following Structural Fill haul to fill and grading activities occurred: <br />A Cat smooth drum roller compacted subgrade between stations FFO+00 to FM12+00 and <br />DDO+00 to DD4+00. <br />A Komatsu loader loaded Cat and John Deere 740 haul trucks with material located between <br />stations 36+00 to 38+00 of the ADR haul road. The Structural Fill was transported to the fill area <br />between stations E14+00 to E15+22 and Q20+0 to Q22+00. Cat dozers and a Cat smooth drum <br />roller placed and compacted the Structural Fill. <br />Cat dozers graded the slope between stations HM10+00 to HM14+00, JM8+00 to JM12+00, <br />JM2+00 to J14+00, UM12+00 to UM14+00 and LM2+00 to L11+36. <br />CC&V hauled material to the Dump 4 surge in Phase 2 using Cat 793 haul trucks. Material was <br />stockpiled, but not placed. <br />Cat dozers graded the slope above L8+00 to L11+35. <br />Cat dozers prepared subgrade between stations HHO+ and HH2+00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.