Laserfiche WebLink
-4- <br />12. Primary future (Post -mining) land use (check one : <br />Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />13. Primary present land use (_check one): <br />14 <br />El Cropland(CR) `� Pastureland(PL) <br />F Rangeland(RL) Forestry(FR) <br />Residential(RS) M Recreation(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />LJ Industrial/Commercial(IC) <br />Method of Mining: Briefly explain mining method (e.g. truck/shovel): _ <br />Surface mining with front-end loader, dozer and trucks <br />15. On Site Processing: —0 Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />List any designated chemicals or acid -producing materials to be used or stored within permit area: <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />We are applying to expand the pit 6.76 acres to the West for continuance of mining and to get <br />into compliance with expansion outside of the approved permit boundaries. <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />LJ Industrial/Commercial(IC) <br />Method of Mining: Briefly explain mining method (e.g. truck/shovel): _ <br />Surface mining with front-end loader, dozer and trucks <br />15. On Site Processing: —0 Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />List any designated chemicals or acid -producing materials to be used or stored within permit area: <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />We are applying to expand the pit 6.76 acres to the West for continuance of mining and to get <br />into compliance with expansion outside of the approved permit boundaries. <br />