Laserfiche WebLink
Exhibit C — Pre -Mining & Mining Plan Map <br />1. The date of commencement shall be from August 28`h, 1998 until approximately August 28`h <br />2018. <br />2. The mining plan is to take between 2-4" of topsoil off, take the gravel/sand underneath, replace <br />the topsoil and reseed as required. <br />3. The proposed road to be used for the mining operation is south of the pit area, heading East <br />approximately 2180 feet for this purpose. County Road 3 is used to access this haul road.. <br />4. Since the gravel mined will be utilized "as is" for county road maintenance, there will be no <br />additional processing. This operation will be strictly for digging for sand and gravel with no <br />other secondary, or incidental use. <br />