Laserfiche WebLink
V0 <br />Page 3 of 5 <br />RECEIVED <br />JUL 20 2115 <br />DNISION t.;- PECLAMATION <br />c Annual Report <br />Permittee Name: <br />Cone'os County <br />Permit Number: <br />M-1987-097 <br />Operation Name: <br />La Florida Gravel Pit <br />County: <br />Cone'os <br />Annual Fee Due: <br />$323.00 <br />Anniversary Date: <br />August 18, 2015 <br />Permit Acreage: <br />9.90 <br />Current Bond Amt: <br />$0.00 <br />According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1)? YES NO <br />N1W S-unk S-ysTA�+NR <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2)? YES NO <br />IS�h1 t—K,�C�L So�bZAMN.Ci� . <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? 7 lv Z, 15 <br />5. Does the mine operate more than 180 days per year © NO <br />If "NO", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES NO <br />b) approval for INTERMITTENT OPERATION? (VES7) NO <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation): I <br />8. Number of acres that were newly affected during the current report year: i . <i Ac2t - <br />9. Number of acres that were reclaimed during the current report year: NONQ. <br />10. Estimated new acreage to be affected in the next report year: 1 iket — <br />11. Estimated acres to be reclaimed in the next report year: 1 . 5 AeCzes <br />IJO IZRCk�q.vt�A�so•� V,vs►S COw►7kgitiD ='�1 d�I� <br />vJ �c(�.d�� a� 0 1�R c u� �+,w. bTz -V%\(t 1 • 57 AMAS cts L-, ZSTB n <br />pn1 T�k�L 1JUr►� I��LOO s�CSe�. <br />