Laserfiche WebLink
Other Reclamation Permits held by Prospective Successor (if applicable): <br />Kennedy Pit M - 1990 - 116 Hayes Hereford Ranch <br />M <br />- 2004 <br />- 023 <br />Landfill Pit <br />M - 2013 - 084 Johnson Pit <br />M - <br />1994 - <br />007 <br />Rafert Pit <br />M - 2004 - 052 Ward Pit <br />M <br />- 2003 - <br />024 <br />Schneller Pit <br />M - 1989 - 095 State - Jensen Pit <br />M - <br />1983 - <br />050 <br />Austin Pit <br />M - 1986 - 047 <br />DESIGNATION OF REVIEW TIMELINE <br />As explained above, the Permittee and Prospective Successor may waive their right to receive a <br />decision on an Application within 30 days in order to allow the Division to calculate the required <br />Financial Warranty before issuing its decision. Permittee and Prospective Successor must initial <br />one of the following two options to designate their choice. If Permittee and Prospective <br />Successor cannot agree, the Division will render its decision within 30 days. <br />Permittee <br />Prospective Successor <br />511p". <br />Per <br />P ospective Successor <br />I have reviewed the information provided in this Application <br />Packet, as well as the applicable Act and Rules. Having been fully <br />informed, I wish to WAIVE MY RIGHT TO A DECISION ON <br />MY APPLICATION WITHIN 30 DAYS. <br />I have reviewed the information provided in this Application <br />Packet, as well as the applicable Act and Rules. Having been fully <br />informed, l wish to MAINTAIN MY RIGHT TO A DECISION <br />ON MY APPLICATION WITHIN 30 DAYS. <br />The Prospective Successor must provide an adequate Financial Warranty or conditional <br />replacement Financial Warranty, consistent with the designation above. Hard Rock and <br />Construction Materials Rule 4.3 describes the various acceptable types of Financial Warranties. <br />Each Financial Warranty must be submitted on the Board's approved forms (available online at <br />http://mining.state.co.us/Mineral`/`2OForms.htm). <br />