Laserfiche WebLink
October 15, 2013 C-1980-004/McClane Canyon Mine ZTT <br />the mine site. Both silt fences were working as designed and were properly installed. Sediment has built up along <br />the silt fences and may need cleaned in the future. <br />Berms surrounding the mine construction material stockpile above the sediment pond were stable. Berms direct <br />surface runoff from the stockpile to the sediment pond. <br />The upland clean water raised box culvert was inspected. No water was being conveyed by the culvert and the <br />collection area around the culvert was dry. The inlet to the culvert was clear of all debris. <br />The East Salt Creek was flowing at the time of the inspection. Recent precipitation event occurred prior to the <br />inspection. <br />Sediment Pond. <br />Sump cleaned. <br />Number of Partial Inspection this Fiscal Year: 0 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Sump being cleaned. <br />Page 3 of 6 <br />