TRI-STATE GENERATION AND TRANSMISSION ASSOCIATION, INC.
<br />HEADQUARTERS: PO BOX 33695 DENVER, COLORADO 80233-0695 303-452-6111
<br />July 14, 2015
<br />Technical Adequacy Response
<br />Dear Mr. Zuber:
<br />Tri-State Generation and Transmission Association, Inc. (Tri-State), is the parent
<br />company to Axial Basin Coal Company, which is the general partner to Colowyo Coal Company
<br />L.P. (Colowyo). Therefore, Tri-State on behalf of Colowyo is submitting this adequacy response
<br />for TR -105 to Permit No. C-1981-019. Tri-State received your adequacy comments dated May
<br />20, 2015, and has the following response to comment 16.
<br />16. In the cover letter for Technical Revision 105 Tri-State states that they have consulted
<br />landowners with regards to the proposed post -mining topography and received verbal
<br />approval for the changes. Please provide the Division with written verification of
<br />landowner approval for the proposed post -mining topography. These letters should
<br />include, at a minimum, BLM and CPW.
<br />Response: On August 20, 2014, Tri-State met with Mr. Jerod Smith from the Colorado State
<br />Land Board, Mr. Jeff Goncalves with Colorado Parks and Wildlife, and Mrs. Jennifer Maiolo
<br />and Mr. Hunter Seim of the Bureau of Land Management and presented the proposed post -
<br />mine topography submitted under TR -105. All parties were informed on how the proposed
<br />changes to the post -mine topography affected each individual landowner property, and they
<br />were also presented with the opportunity to ask any questions they may have had. All parties
<br />verbally- agreed to the proposed post -mine topography presented during the meeting.
<br />At the request of the Division on May 20, 2015, each landowner has provided a concurrence
<br />letter indicating they agree with the proposed post -mine surface submitted under TR -105. A
<br />copy of each letter has been included under with this response. These letters are provided for
<br />documentation purposes for the permanent record only, and are not intended to become part
<br />of the permit application package.
<br />CRAM, STATIt1N EY -At ANI E STA FION NUCLA STATION
<br />PO81}X'311' 1," NVh 91, N() dUX-398
<br />I .'t I It" ._Fail, (1) ,71r., r; 1111' FRFWIT"T ^ASM 37945 NIJ.`..LA :0 8`424
<br />371 824 -1.111 S05 9'2 5200 910-964 11'.;
<br />RECEIVED
<br />Mr. Rob Zuber
<br />Environmental Protection Specialist
<br />Colorado Division of Reclamation, Mining & Safety
<br />JUL 16 2015
<br />Department of Natural Resources
<br />1313 Sherman Street, Room 215
<br />Division of Reclamation,
<br />Denver, CO 80203
<br />Mining & Safety
<br />RE: Colowyo Coal Company L.P.
<br />Permit No. C-1981-019
<br />Technical Revision No. 105 (TR -105), Post Mining Topography Modification
<br />Technical Adequacy Response
<br />Dear Mr. Zuber:
<br />Tri-State Generation and Transmission Association, Inc. (Tri-State), is the parent
<br />company to Axial Basin Coal Company, which is the general partner to Colowyo Coal Company
<br />L.P. (Colowyo). Therefore, Tri-State on behalf of Colowyo is submitting this adequacy response
<br />for TR -105 to Permit No. C-1981-019. Tri-State received your adequacy comments dated May
<br />20, 2015, and has the following response to comment 16.
<br />16. In the cover letter for Technical Revision 105 Tri-State states that they have consulted
<br />landowners with regards to the proposed post -mining topography and received verbal
<br />approval for the changes. Please provide the Division with written verification of
<br />landowner approval for the proposed post -mining topography. These letters should
<br />include, at a minimum, BLM and CPW.
<br />Response: On August 20, 2014, Tri-State met with Mr. Jerod Smith from the Colorado State
<br />Land Board, Mr. Jeff Goncalves with Colorado Parks and Wildlife, and Mrs. Jennifer Maiolo
<br />and Mr. Hunter Seim of the Bureau of Land Management and presented the proposed post -
<br />mine topography submitted under TR -105. All parties were informed on how the proposed
<br />changes to the post -mine topography affected each individual landowner property, and they
<br />were also presented with the opportunity to ask any questions they may have had. All parties
<br />verbally- agreed to the proposed post -mine topography presented during the meeting.
<br />At the request of the Division on May 20, 2015, each landowner has provided a concurrence
<br />letter indicating they agree with the proposed post -mine surface submitted under TR -105. A
<br />copy of each letter has been included under with this response. These letters are provided for
<br />documentation purposes for the permanent record only, and are not intended to become part
<br />of the permit application package.
<br />CRAM, STATIt1N EY -At ANI E STA FION NUCLA STATION
<br />PO81}X'311' 1," NVh 91, N() dUX-398
<br />I .'t I It" ._Fail, (1) ,71r., r; 1111' FRFWIT"T ^ASM 37945 NIJ.`..LA :0 8`424
<br />371 824 -1.111 S05 9'2 5200 910-964 11'.;
<br />
|